My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/17/2024 PZ Combined Special Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
06/17/2024 PZ Combined Special Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 8:14:45 AM
Creation date
6/12/2024 4:43:42 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/17/2024
P&Z Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Supply 11 study is proposed to be completed by 2027.is tasked with establishing a long term plan for water supply in NE Metro. This White Bear Lake Water Supply work group, funded <br /> by legislative action in 2023, Staff is beginning conversations with DNR regarding replacement of well 2. served is an estimated 5,859.approximately 1,400 households over current <br /> demands. Current households The addition of well 7 (well 2 replacement) will maintain capacity for Replacement of well 2 will be required when taken out of service.from dry conditions. <br /> Slower than anticipated growth has allowed system to absorb increased use Current status <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.