My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-01-2024 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
07-01-2024 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 4:09:21 PM
Creation date
6/26/2024 4:04:02 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/01/2024
Council Meeting Type
Work Session Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> <br /> <br />Summary <br /> <br />Public Benefit Gained: <br /> <br />1. Economic expansion <br />2. Greater variety of lot sizes and home types <br />3. Multi-functional greenway corridor and storm water management system <br />4. Vegetative buffer along public ditch <br />5. Landscaped berm and buffer separation from existing land uses <br />6. Efficient use of land and private streets resulting in smaller network of utilities and <br />streets <br />7. Mix of residential and commercial land uses <br />8. Life-cycle housing supported by variety of housing types <br />9. Creation of more open space that is accessible to the public <br />10. More parkland dedication fees available for park development <br />11. Less dense residential development <br />12. Wider landscape buffers and trail corridors <br /> <br />Flexibility Provided: <br /> <br />1. Lot Sizes < 10,800 sf (R-1) and 7,500 sf (R-2) <br />2. Lot Widths < 80ft (R-1) and 60ft (R-2) <br />3. Lot Depths < 135ft <br />4. Building Side Lot Line Setbacks (7.5 ft side) <br /> <br />REQUESTED COUNCIL DIRECTION <br /> <br />Staff is requesting feedback from the City Council. <br /> <br />1. Thoughts on PUD flexibility for lot widths, lot sizes, setbacks? <br />2. Should the applicant hold a neighborhood meeting prior to PUD Preliminary <br />Plan/Preliminary Plat submittal? <br /> <br />ATTACHMENTS <br /> <br />1. Site Location and Aerial Map <br />2. Applicant’s Narrative <br />3. 2040 Future Land Use Plan Map <br />4. Concept Plan, Surrounding Area Aerial Map, & Phasing Plan <br />5. Land Use Plan and Areas
The URL can be used to link to this page
Your browser does not support the video tag.