My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-22-2024 City Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
07-22-2024 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:21:01 PM
Creation date
7/17/2024 4:28:11 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/22/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes 81st Street November 4, 2023 <br />Project #: 22538.23.MNT Page - 6 <br />________________________________________________________________________________________________________ <br /> M I N N E S O T A IOWA W I S C O N S I N <br />and then reused as base material provided the reclaimed material meets Mn/DOT Specification 3138 for <br />Class 5 Aggregate Base. <br />F. Construction Testing and Documentation <br />F.1. Excavation <br />A variety of equipment is expected to be capable of performing earthwork and grading . An excavator or <br />backhoe with a smooth-lipped bucket is recommended for completing any excavations. This is intended <br />to limit disturbance to the supporting soils being left in place, while also producing a smooth working <br />surface. <br />F.2. Compaction <br />Fill should be placed in lifts adjusted to the compactor being used and the material being compacted. We <br />recommend limiting lifts to no more than 1 foot, assuming large, self-propelled or tow-behind compactors <br />are used. Thinner lifts should be used for lighter compaction equipment. <br />F.3. Cold Weather <br />If the earthwork occurs during freezing temperatures, good winter construction practices should be used. <br />No frozen fill should be used nor should structural filling take place on frozen ground. <br />F.4. Construction Phase Testing and Documentation <br />The bottom of all excavations, grading, and roadway subgrade should be evaluated and documented by <br />geotechnical personnel after the unsuitable materials are removed and before placement of any fill or <br />pavement. Samples of any fill materials and/or alternative gradations of materials proposed for use <br />should be submitted for approval before use. The City may wish to have, or may be obligated to have <br />tests performed regarding the other various paving components. Specification of such requirements is <br />normally the responsibility of the City and their design consultant. <br />G. Level of Care <br />The services provided for this project have been conducted in a manner consistent with that level of care <br />and skill ordinarily exercised by members of the profession currently practicing in this area, under simila r <br />budget and time constraints. This is our professional responsibility. No other warranty, expressed or <br />implied, is made.
The URL can be used to link to this page
Your browser does not support the video tag.