My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/14/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
08/14/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 2:19:26 PM
Creation date
8/22/2024 2:18:21 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/14/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />Lotus Lane 60 feet 32 feet <br />Traverse Drive, Pepin Drive 60 feet 30 feet <br /> <br />Watermain, sanitary sewer main, stormwater facilities, streets, sidewalks and trails are being <br />constructed consistent with the PUD Amendment #4. <br /> <br />Public Land Dedication and Fees <br /> <br />Per Resolution No. 16-51, the City will require the following combination of land dedication and <br />cash in lieu of land dedications: <br /> <br />1. Land dedication for the public and private parks will be credited from the total payment <br />in lieu. <br />2. Costs for public park improvements and trail construction will be credited from the total <br />payment in lieu. <br />3. Improvements to the private parks and recreational center will not be credited from the <br />total payment in lieu. <br /> <br />An 8.5 ft wide bituminous trail approximately 230 lf in length will be constructed from the <br />existing trail to Lotus Lane. A Permanent Trail Easement with exhibit shall be drafted and <br />recorded after the trail has been constructed to ensure the trail is within the easement. Trail <br />construction costs will be credited. <br /> <br />The following is a summary of the public land dedication and fees: <br /> <br />Watermark 8th Addition <br />Total # Units = 97 <br />x Park Dedication Fee $3,300 <br />= Cash in Lieu Value $320,100 <br />(Trail Construction Costs) ($9,300) <br />TOTAL CASH FEE DUE = $310,800 <br /> <br />Access Drive to Billboard <br /> <br />An existing billboard is located in the northeast corner of the Watermark development. U.S. <br />Home, LLC leases the land to the billboard owner. A 12ft wide gravel private access drive is
The URL can be used to link to this page
Your browser does not support the video tag.