My WebLink
|
Help
|
About
|
Sign Out
Home
Search
20240828 Environmental Board Packet Combined
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2024
>
20240828 Environmental Board Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 12:35:34 PM
Creation date
8/23/2024 12:34:11 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
08/28/2024
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />RECOMMENDATIONS <br /> <br />Staff recommends that the Preliminary Plat for the Slater Addition be forwarded to the <br />Planning and Zoning Board and City Council with the following comments: <br /> <br />1. Tree Protection Zones (TPZs) for the 37 trees scheduled for preservation must be <br />shown to scale on the Grading, Drainage, and Erosion Control Plan (Sheet C1.1), <br />Removals Plan (Sheet C1.2), and the Landscape Plan (Sheet C1.3). The TPZs must <br />be in place prior to issuance of grading permit and will be reviewed by staff <br />concurrently with inspection of sediment and erosion control measures. <br /> <br />2. Replace note on Grading, Drainage, and Erosion Control Plan about installing <br />tree protection with “Tree Protection Fence installed in accordance with City <br />Tree Protection Fence Detail”. <br /> <br />3. The Landscape Plan (Sheet L1) should include a note that “Existing Trees shall be <br />protected in accordance with City Tree Protection Fence Detail. City Tree <br />Protection Fence Detail should be added to Sheet C3.1. <br /> <br />4. The tree planting detail shall include comments about exposing root flare so it is <br />visibly at grade to ensure trees are installed at proper depth, and that mulch is <br />pulled back 3 inches from the trunk (mulch is not left touching the trunk). <br /> <br />5. 1 mitigation tree is required. These trees must be added to the Landscape Plan <br />(Sheet C1.3). <br /> <br />6. The boulevard tree shown for Lot 1 must be moved north into the right-of-way. <br /> <br />7. Ground cover types must be added to the Landscape Plan (Sheet C1.3). This <br />includes cover type for all exposed soil areas (ex: sod for the lots) <br /> <br />ATTACHMENTS <br /> <br />1. Resource Inventory Map <br />2. Preliminary Plat (Sheet S2) <br />3. Tree Inventory with Removals (Sheet S3) <br />4. Grading, Drainage, and Erosion Control Plan (Sheet C1.1) <br />5. Landscape Plan (Sheet C1.3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.