My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/11/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
09/11/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 3:13:12 PM
Creation date
9/6/2024 3:01:11 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/11/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />The parcel is not located within a Shoreland Management Overly district. <br /> <br />Impervious Surface Coverage <br /> <br />The maximum allowed impervious surface coverage per lot is 65%. Lot 3 (existing house) <br />is at 9.4% and compliant. The impervious coverage for Lot 1 and 2 will be evaluated <br />with those individual building permits and surveys. <br /> <br />Traffic Study <br /> <br />A traffic study was not required for two (2) new single family lots on the Lois Lane. The <br />street is a minor collector and has capacity for two (2) additional single family homes. <br /> <br />Additional City and Government Agency Review Comments <br /> <br />Public Safety Comments <br /> <br />Lino Lakes Public Safety Department-Police Division and Fire Division reviewed the <br />preliminary plat and had no comments. <br /> <br />Environmental Board <br /> <br />The Environmental Board reviewed the development proposal on August 28, 2024. Their <br />comments are summarized in the attached Environmental Memo dated August 29, <br />2024. <br /> <br />Agreements <br /> <br />Stormwater Maintenance Agreement <br /> <br />A stormwater maintenance agreement is not required since a stormwater management <br />plan is not required per City Code Chapter 1010. <br /> <br />Development Agreement and Final Plat <br /> <br />The applicant shall submit a Land Use Application for final plat after preliminary plat <br />approval. A Development Agreement will then be prepared by the City as part of the final <br />plat application. <br /> <br />Comprehensive Plan <br /> <br />Slater Addition is consistent with the goals and policies of the comprehensive plan in <br />regards to land use, housing, economic development, transportation, local water <br />management plan, sanitary sewer, water supply and parks, greenway and trails.
The URL can be used to link to this page
Your browser does not support the video tag.