Laserfiche WebLink
4 <br />The following housing types and products proposed for the 8th Addition are consistent with the <br />approved Land Use Plan. <br />Housing Type Lot Width Housing Product # Lots <br />Single Family 75’ Landmark 19 <br />Single Family 60’-65’ Heritage/Discovery 15 <br />Single Family 55’+ Venture/Villa 63 <br />TOTAL 97 <br />Architectural Standards <br />Resolution No. 17-133 and Resolution No. 19-131 detail architectural design standards for the <br />entire Watermark development. As required, a Watermark 8th Addition Home Plans summary <br />booklet and Architectural Standards Matrix were submitted. The booklet and matrix detail <br />compliance of the housing products with the resolutions in regards to exterior materials and <br />styles, house elevations and garage and porch requirements. There are over 30 different single <br />family house plans with multiple facade and elevation options for a combination of over 275 <br />different housing styles proposed for the 8th Addition. <br />Color packages and anti-monotony plans will be included with each building permit application <br />to ensure that the homes elevations are varied with a minimum of five different styles and <br />those homes in proximity to each other not look alike in terms of the combination of color of <br />siding, accent and roofing materials. Coventry by Alside vinyl siding with .042” panel thickness <br />is proposed on all the housing units. All houses have minimum 4” window trim on the side and <br />rear elevations to meet resolution requirements to incorporate an architectural feature into <br />those elevations that are visible from 20th Avenue (CSAH 54), 21st Avenue N. and the public <br />park. <br />In summary, the Watermark 8th Addition single family housing types and products meet the <br />architectural design standards requirements of Resolution No. 17-133 and Resolution No. 19- <br />131. <br />HOA Clubhouse <br />Lot 1, Block 3, Watermark 4th Addition was platted for the construction of the HOA clubhouse. <br />Construction started in May 2023 and opened in Spring 2024. <br />Subdivision Ordinance <br />Conformity with the Comprehensive Plan and Zoning Code