My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-09-24 - City Council Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
09-09-24 - City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 2:17:26 PM
Creation date
9/9/2024 2:10:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/09/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Street and Utilities <br />The 8th Addition proposes construction of the following streets which are consistent with PUD <br />Amendment #4: <br />Street Name Right-of-Way Width Street Width <br />(Back to Back) <br />Lotus Lane 60 feet 32 feet <br />Traverse Drive, Pepin Drive 60 feet 30 feet <br />Watermain, sanitary sewer main, stormwater facilities, streets, sidewalks and trails are being <br />constructed consistent with the PUD Amendment #4. <br />Public Land Dedication and Fees <br />Per Resolution No. 16-51, the City will require the following combination of land dedication and <br />cash in lieu of land dedications: <br />1.Land dedication for the public and private parks will be credited from the total payment <br />in lieu. <br />2.Costs for public park improvements and trail construction will be credited from the total <br />payment in lieu. <br />3.Improvements to the private parks and recreational center will not be credited from the <br />total payment in lieu. <br />An 8.5 ft wide bituminous trail approximately 230 lf in length will be constructed from the <br />existing trail to Lotus Lane. A Permanent Trail Easement with exhibit shall be drafted and <br />recorded after the trail has been constructed to ensure the trail is within the easement. Trail <br />construction costs will be credited. <br />The following is a summary of the public land dedication and fees: <br />Watermark 8th Addition <br />Total # Units = 97 <br />x Park Dedication Fee $3,300 <br />= Cash in Lieu Value $320,100 <br />(Trail Construction Costs) ($9,300)
The URL can be used to link to this page
Your browser does not support the video tag.