Laserfiche WebLink
subconsultants to the Client or to anyone claiming by, through or under the Client, for any and all claims, <br />losses, costs, attorneys' fees, or damages whatsoever arising out of or in any way related to the services <br />under this Agreement from any causes, including but not limited to, the negligence, professional errors or <br />omissions, strict liability or breach of contract or any warranty, express or implied, of Kimley-Horn or Kimley- <br />Horn's officers, directors, employees, agents, and subconsultants, shall not exceed twice the total <br />compensation received by Kimley-Horn under this Agreement or $50,000, whichever is greater. Higher limits <br />of liability may be negotiated for additional fee. This Section is intended solely to limit the remedies available <br />to the Client or those claiming by or through the Client, and nothing in this Section shall require the Client to <br />indemnify Kimley-Horn. <br />11) Mutual Waiver of Consequential Damages. In no event shall either party be liable to the other for any <br />consequential, incidental, punitive, or indirect damages including but not limited to loss of income or loss of <br />profits. <br />12) Construction Costs. Under no circumstances shall Kimley-Horn be liable for extra costs or other <br />consequences due to changed or unknown conditions or related to the failure of contractors to perform work <br />in accordance with the plans and specifications. Kimley-Horn shall have no liability whatsoever for any costs <br />arising out of the Client's decision to obtain bids or proceed with construction before Kimley-Horn has issued <br />final, fully approved plans and specifications. The Client acknowledges that all preliminary plans are subject <br />to substantial revision until plans are fully approved and all permits obtained. <br />13) Certifications. All requests for Kimley-Horn to execute certificates, lender consents, or other third -party <br />reliance letters must be submitted to Kimley-Horn at least 14 days prior to the requested date of execution. <br />Kimley-Horn shall not be required to execute certificates, consents, or third -party reliance letters that are <br />inaccurate, that relate to facts of which Kimley-Horn does not have actual knowledge, or that would cause <br />Kimley-Horn to violate applicable rules of professional responsibility. <br />14) Dispute Resolution. All claims arising out of this Agreement or its breach shall be submitted first to <br />mediation in accordance with the American Arbitration Association as a condition precedent to litigation. Any <br />mediation or civil action by Client must be commenced within one year of the accrual of the cause of action <br />asserted but in no event later than allowed by applicable statutes. <br />15) Hazardous Substances and Conditions. Kimley-Horn shall not be a custodian, transporter, handler, <br />arranger, contractor, or remediator with respect to hazardous substances and conditions. Kimley-Horn's <br />services will be limited to analysis, recommendations, and reporting, including, when agreed to, plans and <br />specifications for isolation, removal, or remediation. Kimley-Horn will notify the Client of unanticipated <br />hazardous substances or conditions of which Kimley-Horn actually becomes aware. Kimley-Horn may stop <br />affected portions of its services until the hazardous substance or condition is eliminated. <br />16) Construction Phase Services. <br />a. If Kimley-Horn prepares construction documents and Kimley-Horn is not retained to make periodic site visits, <br />the Client assumes all responsibility for interpretation of the documents and for construction observation, <br />and the Client waives any claims against Kimley-Horn in any way connected thereto. <br />b. Kimley-Horn shall have no responsibility for any contractor's means, methods, techniques, equipment choice <br />and usage, equipment maintenance and inspection, sequence, schedule, safety programs, or safety <br />practices, nor shall Kimley-Horn have any authority or responsibility to stop or direct the work of any <br />contractor. Kimley-Horn's visits will be for the purpose of observing construction and reporting to the Client <br />whether the contractors' work generally conforms to the construction documents prepared by Kimley-Horn. <br />Kimley-Horn neither guarantees the performance of contractors, nor assumes responsibility for any <br />contractor's failure to perform its work in accordance with the contract documents. <br />c. Kimley-Horn is not responsible for any duties assigned to it in the construction contract that are not expressly <br />provided for in this Agreement. The Client agrees that each contract with any contractor shall state that the <br />contractor shall be solely responsible forjob site safety and its means and methods; that the contractor shall <br />indemnify the Client and Kimley-Horn for all claims and liability arising out of job site accidents; and that the <br />Client and Kimley-Horn shall be made additional insureds under the contractor's general liability insurance <br />policy. <br />17) No Third -Party Beneficiaries; Assignment and Subcontracting. This Agreement gives no rights or <br />benefits to anyone other than the Client and Kimley-Horn, and all duties and responsibilities undertaken <br />Rev 07/2024 <br />