My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/09/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
10/09/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:32:07 PM
Creation date
10/4/2024 12:14:06 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/09/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />10/02/2024 <br />Page 5 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />corridor study of Lake Drive in 2020, from Hodgson Rd to Pine St. This study evaluated <br />access and mobility. As improvements are completed on Lake Dr in the future the <br />mobility will improve throughout the corridor. This study can be found on Anoka County’s <br />website. <br />The Lino Retail 2.0 project site proposes one access to the north and one access to the <br />south of the realigned Market Place Drive. There will be stubs to the north and south to <br />extend the drive aisles further in the future. Reference the easement section here within <br />and planner’s report for access easement information. <br />As required by Ordinance the applicant submitted a Traffic Impact Study. The proposed <br />development is expected to generate approximately 214 AM peak hour, 212 PM peak <br />hour, and 2,680 daily trips. 95% of the daily trips will go directly from the site to Market <br />Place Dr and eastbound to Lake Dr. Traffic from the proposed development on adjacent <br />local roadways is considered minimal. Marilyn Dr existing volumes are 170 daily trips and <br />with the Market Place realignment 270 trips per day are estimated, with the proposed <br />development 370 daily trips. 77th St existing volumes are 175 daily trips and with the <br />Market Place realignment 250 trips per day are estimated, with the proposed <br />development 280 daily trips. These volumes are well under capacity for the local <br />roadways. <br />The study also analyzed capacity of the following intersections: <br />•CSAH 23 (Lake Dr) & Market Place Dr <br />•CSAH 23 (Lake Dr) & 77th St W <br />•77th St W & Marilyn Dr <br />To evaluate the intersection of CSAH 23 (Lake Dr) & Market Place Dr the intersection of <br />CSAH 23 (Lake Dr) & 79th St was included in the study. The build condition capacity <br />analysis has an overall LOS A during AM and PM peak hours thus meeting ordinance. <br />There are no delay or queuing issues identified. <br />Sidewalk will be installed by the City along Market Place Dr from Lake Dr to 77th St/ <br />Marilyn Dr. There is also sidewalk along Lake Dr in the development area. There are <br />pedestrian crossings at the intersection of CSAH 23 (Lake Dr) & Market Place Dr. The <br />City has a future tail planned along Lake Dr from Apollo Drive to Main Street. <br />Comments: <br />1. The proposed site access’ north and south should be stop conditions. <br />2.We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for emergency access. <br />3.Provide turning movements for all proposed emergency, garbage, and delivery/semi- <br />truck vehicles. <br />•Wetlands and Mitigation Plan
The URL can be used to link to this page
Your browser does not support the video tag.