My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-14-2024 - City Council Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
10-14-2024 - City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 3:42:32 PM
Creation date
10/9/2024 3:32:47 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/14/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 1F <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br />MEETING DATE: October 14, 2024 <br />TOPIC: Consider Resolution No. 24-133, Approving Payment No. 5 and <br />Final, Pheasant Run Reconstruction Project <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting council consideration to finalize the Pheasant Run Reconstruction Project. <br />BACKGROUND <br />On April 10, 2023, the City Council passed resolution 23-22, awarding the contract for the <br />Pheasant Run Reconstruction Project to A-1 Excavating, LLC. in the amount of $886,886.00. <br />Construction of the project began in spring of 2023 and was substantially completed in fall of <br />2023 with final restoration approved in 2024. <br />On July 10, 2023 the City Council approved change order No. 1 in the amount of $29,800.00 to <br />perform a pre -condition survey and monitor the vibration on the project. On September 11, <br />2023 the City Council approved change order No. 2 in the amount $58,440.00 to remove and <br />replace gate valves that were in need of repair outside of the project limits. The Pheasant Run <br />Project contract with A-1 Excavating, LLC with change order 1 and 2 increased to $975,126.00. <br />The change orders were within the project planned contingencies and budget. <br />The final contract amount is $987,300.34 for the Pheasant Run Reconstruction Project. The <br />additional cost was due to driveway work at Well No. 5. The budget for the Pheasant Run <br />Reconstruction Project, including soft costs and contingencies, is $1,270,000.00. The project is <br />still within budget which included contingencies. Funding for the project is from the 2021 <br />Street Reconstruction Bonds, the Water and Sewer Operating Funds, the Trunk Water Fund, <br />and the Street Reconstruction Fund. <br />RECOMMENDATION <br />Approve Resolution No. 24-133, Approving Payment No. 5 and Final, Pheasant Run <br />Reconstruction Project in the amount of $56,202.64 to A-1 Excavating, LLC. <br />ATTACHMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.