Laserfiche WebLink
VAURTI-1AIMAIL • A ar-sil► IF�111 11• c ORION!i a � . 1 , - <br />WHEREAS, the City Council finds that it would be in the best interest of the City to <br />proceed with the preparation of plans and specifications for the 2025 Street Reconstruction and <br />Sewer and Water Extension Project. The project includes the Colonial Woods neighborhood <br />including 62nd Street (east of W Shadow Lake Dr.) and Red Maple Lane as well as the Pine <br />Haven neighborhood including 81st Street, Elbe Street, and Danube Street. The project also <br />includes an overlay of Diane Street and Evergreen Trail; and <br />WHEREAS, on June 10, 2024 the City Council accepted the Feasibility Report for the 2025 <br />Street Reconstruction and Sewer and Water Extension Project for the Colonial Woods and Pine <br />Haven Neighborhoods. Public Hearings were held on July 8 and 22, 2024. Per the City's Charter <br />the 60 day petition period passed and the City did not receive a valid petition against the project <br />in either neighborhood; and <br />WHEREAS, WSB, the City Engineer, has submitted a proposal to prepare plans and <br />specifications for said improvements. <br />NOW, THEREFORE BE IT RESOLVED by the City Council of Lino Lakes, Minnesota: <br />1. Authorizes the Preparation of the Plans and Specifications for the 2025 Street <br />Reconstruction and Sewer and Water Extension Project. <br />2. WSB is designated as the engineer for this improvement and directed to prepare <br />plans and specifications for the 2025 Street Reconstruction and Sewer and Water <br />Extension Project for an amount not to exceed $445,000.00. <br />Adopted by the Council of the City of Lino Lakes this 23rd day of September, 2024. <br />Rob Rafferty, Mayor <br />ATTEST: <br />Zr�.' <br />Roberta Colotti, City Clerk <br />