My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-04-2024 Council Work Session Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
11-04-2024 Council Work Session Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 4:52:57 PM
Creation date
11/1/2024 4:19:29 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/04/2024
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />WORK SESSION STAFF REPORT <br />ITEM NO. 8 <br />STAFF ORIGINATOR: Justin Williams, Public Works Superintendent <br />WORK SESSION DATE: November 4, 2024 <br />TOPIC: Public Works Building RFP for Architectural/Engineering Services <br />BACKGROUND <br />Over the past 10 years, the City has been evaluating the construction of a new public works <br />building to replace the existing facility at 1189 Main Street. Constructed in 1971, the buildings <br />are substandard and do not meet the current and future needs of the City. <br />The City Council has continued to express interest in moving forward with the project. A site <br />tour of Hugo's facility was taken in 2022 to establish needs and the scope of the project. The <br />council directed staff to move forward with obtaining architectural and entering services in <br />2023. Staff has since worked with the finance department to identify potential finance sources. <br />The project was included in the 5-year plan for a 2026 build. $400,000 from the Building and <br />Facilities fund was identified for design and expenses in 2025. <br />The proposed project includes construction of a Public Works Facility on approximately 10.0 <br />acres owned by the City of Lino Lakes at 1189 Main St. The site includes an adjacent 14 acres <br />that includes park improvements and a materials yard. The project will include a public works <br />facility with vehicle storage, vehicle maintenance, and office space, parking lots, commodity <br />bins, access roads, community meeting space, site work, and utilities. It is anticipated that the <br />new facility will include community meeting space to accommodate election precinct <br />operations, senior events, educational and training functions. The expected budget for this <br />project is approximately $16,400,000. <br />City staff is proposing to move forward with the process to select an architectural and <br />engineering firm for design through the Request for Proposal (RFP) process. <br />REQUESTED COUNCIL DIRECTION <br />Staff is requesting City Council direction for a RFP for Architectural and Engineering Services for <br />a new public works facility. If council recommendation is to move forward with the RFP process, <br />staff will bring the item to council for approval at the November 12t" Council meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.