My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-04-2024 Council Work Session Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
11-04-2024 Council Work Session Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 4:52:57 PM
Creation date
11/1/2024 4:19:29 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/04/2024
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />10/29/2024 <br />Page 2 <br />Grading <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br />Comments: <br />1. Watershed district approval for the City project is still pending. Additional stormwater <br />features may be required as a result of the final review. <br />2. Call out all EOFs from site stormwater basins, existing and proposed. <br />3. Tip -in curb and gutter on islands of the parking lot for Building B will result in ponded <br />water, specify tip -out. <br />4. Shift the sidewalk on the west side of the driveway south towards the roadway in <br />order to eliminate the retaining wall in the City basin. <br />5. Retaining walls will require permitting through the City separate from the building <br />permit. <br />6. Provide Emergency Overflow (EOF) elevations for all low points in the parking or <br />green space areas. <br />• Stormwater Management <br />Stormwater management for the Lino Retail 2.0 site consists of infiltration basins for the <br />southern and northern lots. Additionally, some stormwater infrastructure is proposed for the <br />City realignment of Marketplace Drive. Existing and proposed discharge rates are <br />summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition <br />2-Year <br />10-Year <br />100-Year <br />10-Day Snowmelt <br />Needed if basins <br />Existing <br />0.00 <br />0.35 <br />5.98 <br />landlocked <br />Currently <br />Needed if basins <br />0.00 <br />0.18 <br />4.90 <br />Proposed <br />landlocked <br />Comments: <br />1. An approximate City storm sewer alignment is marked up on the plans showing the <br />pipe intended to provide an outflow for the site rather than emergency overflows. The <br />northern infiltration basin shall outlet into the pipe. <br />2. Remove the City infiltration basin between the roadway and parking lot, the basin <br />west of the driveway access will provide sufficient storage for runoff. <br />Java Properties - Lino Retail 2.0 Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.