My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
11/13/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2024 10:18:59 AM
Creation date
11/8/2024 10:16:25 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />11/6/2024 <br />Page 3 <br />Spargur Estates Engineering Review <br />(Plowe 10/15//24) Noted <br />(WSB 11/6/24) Complete <br />•The highpoint on the east side at the front of Lot 4 would become the <br />secondary EOF for the existing basin to the east when inundated. <br />(Plowe 10/15//24) Noted <br />(WSB 11/6/24) Previous 908.7 EOF acted as a secondary EOF for the <br />adjacent developments to the east and west and must be maintained <br />(Basin to the east is 'land-locked' and will ultimately flow back to the west). <br />1 Areas along the side property line can be filled to improve <br />drainage swales but the 908.7 EOF must be maintained <br />2 Adjacent grading should be contained to drainage and <br />utility easements <br />3 Grading on adjacent property must be coordinated and <br />approved by the adjacent property owner <br />4 Provide written documentation to the City prior to <br />construction <br />•(WSB 11/6/24) The Lowest Opening Elevation (LOE) of Lots 2 and 3 must <br />be at least 910.7 to maintain minimum freeboard with the EOF (908.7) <br />1 The Lowest Floor elevation must be a minimum 909.4 <br />(SELO) <br />•Stormwater Management <br />Stormwater management for the site consists of a small read yard depression. However, <br />based on site layout, stormwater management is not required under City ordinance. <br />Comments on the proposed stormwater design are offered below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 0.62 1.70 4.17 Not required <br />Proposed 1.27 2.80 6.43 Not required <br />Comments: <br />1.There are minor increases in site runoff rates due to the new impervious. <br />However, as stormwater management requirements are not triggered, these <br />increases are not regulated. Runoff to the north and south will be captured <br />by storm sewer routing to City ponds. <br />(Plowe 10/15//24) Noted. <br />(WSB 11/6/24) Complete <br />2.Sufficient freeboard is available between the depression modeled HWL and <br />the proposed household low floors/low entries.
The URL can be used to link to this page
Your browser does not support the video tag.