Laserfiche WebLink
Delay Penalty <br />For up to three days of non -completion and non- $ 60.00 <br />prior notice before specified date. After three days <br />an additional charge of $10.00 per day will be <br />levied. <br />Degradation Fee <br />Degradation Fee Formula: <br />This formula covers degradation for depreciation caused by intrusion into the right-of- <br />way. The depreciation applies to the original surface of the right-of-way and to the <br />overlays and seal -coats applied to the surface. The formula includes life expectancy <br />schedules for each and has an estimated cost per square yard based on the quality of the <br />right-of-way surface required for different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per square yard for street, overlay, and <br />seal -coat, multiplied by the depreciation schedule, multiplied by the area of the street <br />patch. <br />Degradation Fee: <br />(cost per square yard for street overlay and seal -coat x depreciation schedule rates) x <br />area of street patch = degradation fee <br />I ITII ITV CCCC <br />Water Utility Rates <br />Residential <br />Base Fee <br />Consumption Fee <br />0 - 20,000 Gallons <br />20,001- 40,000 Gallons <br />40,001- 80,000 Gallons <br />80,001- 120,000 Gallons <br />Over 120,000 Gallons <br />Non -Residential <br />Base Fee <br />Consumption Fee <br />0 - 20,000 Gallons <br />$ 25.00 /Quarter/REU* <br />25.00 /nu-,Fte /REJ i* <br />$ 2.19 <br />/Thousand Gallons <br />$ 2.19 <br />$ 2.43 <br />/Thousand Gallons <br />$ 2.34 <br />$ 3.04 <br />/Thousand Gallons <br />/The <br />$ 2.92 <br />$ 3.65 <br />sand Gallens <br />/Thousand Gallons <br />/Thousand <br />$ 3.91 <br />$ 4.26 <br />$ 4-09 <br />Gallens <br />/Thousand Gallons <br />$ 25.00 /Quarter/REU* <br />$ 20.00 /Quarte /RE i* <br />$ 2.19 /Thousand Gallons <br />