Laserfiche WebLink
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM <br />STAFF ORIGINATOR: Justin Williams, Public Works Superintendent <br />MEETING DATE: November 12, 2024 <br />TOPIC: Public Works Facility RFP for Architectural/Engineering Services <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting City Council consideration to authorize and advertise a Request for Proposals <br />(RFP) to obtain architectural and engineering services for the construction of a public works <br />facility. <br />BACKGROUND <br />Over the past 10 years, the City has been evaluating the construction of a new public works <br />building to replace the existing facility at 1189 Main Street. Constructed in 1971, the buildings <br />are substandard and do not meet the current and future needs of the City. The City Council has <br />continued to express interest in moving forward with the project. <br />The proposed project includes construction of a Public Works Facility on approximately 10.0 <br />acres owned by the City of Lino Lakes at 1189 Main St. A site tour of Hugo's facility was taken in <br />2022 to establish needs and the scope of the project. The council directed staff to move <br />forward with obtaining architectural and engineering services in 2023. Staff has since worked <br />with the finance department to identify potential funding sources. The project was included in <br />the 5-year plan for a 2026 build. $400,000 from the Building and Facilities fund was identified <br />for design and expenses in 2025. <br />The site includes an adjacent 14 acres that includes park improvements and a materials yard. <br />The project will include a public works facility with vehicle storage, vehicle maintenance, and <br />office space, with parking lots, commodity bins, access roads, community meeting space, site <br />work, and utilities. It is anticipated that the new facility will include community meeting space <br />to accommodate election precinct operations, senior events, educational and training <br />functions. The expected budget for this project is approximately $16,400,000. <br />