Laserfiche WebLink
Ms. Katie Larsen <br />11 /6/2024 <br />Page 4 <br />(Plowe 10/15//24) Per client request, the units shown are now split -entry <br />walkouts; these low floors had to be raised to meet the 2-ft freeboard <br />requirement. <br />(WSB 11/6/24) The revised lowest openings for Lots 2 and 3 no longer meet <br />minimum freeboard requirements with the adjacent EOFs (909.5+). <br />It is necessary to maintain <br />• Water Supply <br />The proposed water will be supplied by three existing 1-inch Type K copper services <br />extended to the lots. <br />Comments: <br />4- She,.q the o iotinn well fer Let 1 if present <br />• Sanitary Sewer <br />The proposed sanitary sewer will be supplied by existing 4-inch diameter Schedule 40 <br />PVC gravity service pipes extended to the lots from Arlo Lane (Lots 2 and 3). The existing <br />lot (Lot 1) has been previously connected to a service in Lois Lane. <br />Spargur Estates Engineering Review <br />