Laserfiche WebLink
Ms. Katie Larsen <br />12/4/2024 <br />Page 7 <br />Spargur Estates Engineering Review <br />•Drainage and Utility Easements <br />The current drainage and utility easements are being maintained from the original single- <br />family lot (10’ front; 5’ sides). Additional easements need to be added around the <br />perimeter of the smaller lots (10’ front and back; 5’ sides). <br />•Development Agreement <br />A development agreement will be required with the final plat. <br />•Grading Agreement <br />No grading agreement is required for this site. <br />•Stormwater Maintenance Agreement <br />No stormwater maintenance agreement is required for this site. <br />•Permits Required <br />1.Rice Creek Watershed District Erosion Control Permit <br />2.City of Lino Lakes Zoning Permit for Construction <br />If you or the applicant have any questions regarding these comments, please contact Kris <br />Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us.