My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/11/2024 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2024
>
12/11/2024 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 2:42:13 PM
Creation date
12/6/2024 2:35:19 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/11/2024
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />location and drainage should be shown on the plan set if it is required to be <br />maintained. <br />4.The project site is located with the I-35 E corridor AUAR. As part of the planning the <br />AUAR mitigation checklist should be used. <br />a. This area is listed as an area of cultural significance and will need to be <br />investigated. <br />5.Building setbacks to Peltier Lake should be shown on the plant set to confirm 150’ <br />setback requirements are met. <br />6.Confirm building heights, open space, and impervious cover within the shoreland <br />area to confirm all requirements are being met. <br />7.Building height should be limited to a maximum of 36’ or less in the shoreland zone. <br />Confirm heights of buildings on future submittals. <br />8.Provide conservation easements over all wetland and open space in the <br />development to ensure connectivity with existing and future development. <br />a.A contiguous path should be created from the lake extending east to 35E and <br />beyond. <br />9.Retain 50’ wide drainage & utility easement over trunk storm sewer. <br />10.Provide removal of dead ash trees within dedicated park and open space to limit <br />maintenance required by the city once ownership is transferred. <br />11.Within the tree preservation plan break down the removals between the basic use <br />area and where mitigation is required. <br />a.Stormwater BMP’s are not included in the basic land use area. Currently <br />removal of trees is being shown for stormwater ponding and would require <br />mitigation. <br />12.Provide additional detail on stormwater management BMP’s. Infiltration should be <br />proposed where feasible based on soil types and depth of groundwater. <br />13.A stormwater treatment train that filters and treats stormwater runoff as it flows <br />through the site should be developed. Any opportunities to incorporate natural <br />treatment systems into the project should be encouraged.
The URL can be used to link to this page
Your browser does not support the video tag.