Laserfiche WebLink
PROPOSAL FORM CITY HALL STORM SEWER PROJECT <br />Line Item <br />Item Description <br />UofM <br />Quantity <br />Unit Price <br />Extension <br />1 <br />MOBILIZATION <br />LS <br />1 <br />$ <br />7,000.00 <br />$ 7,000.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />93 <br />$ <br />8.50 <br />$ 790.50 <br />3 <br />REMOVE CONCRETE <br />SY <br />18 <br />$ <br />85.00 <br />$ 1,530.00 <br />4 <br />2XT CATCH BASIN WITH CASTING <br />EACH <br />1 <br />$ <br />3,265.00 <br />$ 3,265.00 <br />5 <br />48" DIA MH WITH CASTING <br />LF <br />8.27 <br />$ <br />715.00 <br />$ 5,913.05 <br />6 <br />15" CL V RCP <br />LF <br />64 <br />$ <br />110.00 <br />$ 7,040.00 <br />7 <br />15" FES WITH TRASH GUARD <br />SF <br />1 <br />$ <br />2,275.00 <br />$ 2,275.00 <br />8 <br />CLASS IV RIP RAP <br />CY <br />3.5 <br />$ <br />175.00 <br />$ 612.50 <br />9 <br />2360 3.5" TYPE SP 9.5 WEAR COURSE MIX (SPWEA240B) <br />SY <br />93 <br />$ <br />90.00 <br />$ 8,370.00 <br />10 <br />CONCRETE CURB AND GUTTER (B618, B612, RIBBON) <br />LF <br />101 <br />$ <br />53.00 <br />$ 5,353.00 <br />11 <br />6" CL V AGGRAGATE BASE <br />SY <br />93 <br />$ <br />24.00 <br />$ 2,232.00 <br />12 <br />COMMON EX AND SELECT GRANULAR (IF NEEDED) <br />CY <br />100 <br />$ <br />19.75 <br />$ 1,975.00 <br />13 <br />SEED, FERTALIZER, TOPSOIL, EROSION BLANKET (NATURAL NET) <br />SY <br />182 <br />$ <br />53.00 <br />$ 9,646.00 <br />TOTAL <br />$ 56,002.05 <br />Notes <br />Clearing and grubbing incidental to mobilization <br />Seed Mix to be approved by the Engineer <br />Contractor to coordinate Gopher One <br />City of Lino Lakes Signature: <br />Date: <br />Contractor signature:�� <br />Date: 'd_d^ 2y <br />