Laserfiche WebLink
b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored <br />during construction and/or operation of the project. Indicate method of disposal. Discuss <br />potential environmental effects from solid waste handling, storage and disposal. Identify <br />measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid <br />waste including source reduction and recycling. <br />Solid and liquid wastes generated from construction materials and equipment are expected in minimal <br />amounts during periods of active construction. Wastes may include sediment laden construction <br />dewatering or typical construction debris associated with residential development (lumber, siding, <br />roofing materials, etc.). The contractor will be required to immediately haul offsite and/or temporarily <br />store and dispose (or recycle) of all waste in accordance with MPCA regulations and the NPDES <br />Construction Stormwater Permit. <br />c. Project related use/storage of hazardous materials - Describe chemicals/hazardous materials <br />used/stored during construction and/or operation of the project including method of storage. <br />Indicate the number, location and size of any new above or below ground tanks to store <br />petroleum or other materials. Indicate the number, location, size and age of existing tanks on the <br />property that the project will use. Discuss potential environmental effects from accidental spill <br />or release of hazardous materials. Identify measures to avoid, minimize or mitigate adverse <br />effects from the use/storage of chemicals/hazardous materials including source reduction and <br />recycling. Include development of a spill prevention plan. <br />Hazardous materials (portable fuel tanks and lubricants) may be used for equipment operations during <br />construction and temporarily placed onsite in sealed containers (at all times) and under secured <br />restricted access during non -working hours. These materials will only be used during active <br />construction for refueling and maintenance of construction equipment. To ensure that fuel spills do <br />not contaminate surface and ground waters, construction and maintenance activities would occur at <br />reasonable distances from surface waters and steep sloped areas. The contractor will be required to <br />abide by the Pollution Prevention Management Measures (Part IV.F.2) of the NPDES Construction <br />Stormwater Permit. All hazardous materials will be removed from the Project site upon completion of <br />construction. <br />d. Project related generation/storage of hazardous wastes - Describe hazardous wastes <br />generated/stored during construction and/or operation of the project. Indicate method of <br />disposal. Discuss potential environmental effects from hazardous waste handling, storage, and <br />disposal. Identify measures to avoid, minimize or mitigate adverse effects from the <br />generation/storage of hazardous waste including source reduction and recycling <br />Hazardous waste storage and disposal associated with construction activities will comply with the <br />NPDES Storm Water Pollution Prevention Plan during periods of construction. Following construction, <br />the development is not anticipated to generate significant volumes of hazardous wastes. <br />14. Fish, wildlife, plant communities, and sensitive ecological resources (rare features): <br />a. Describe fish and wildlife resources as well as habitats and vegetation on or in near the site. <br />Page 20 <br />