Laserfiche WebLink
24-30671 ASH STREET TRAFFIC IMPACT STUDY - LINO LAKES, MN <br />TABLE OF CONTENTS <br />Executive Summary, Conclusions, + Recommendations.......................................................................................................................1 <br />Summary................................................................................................................................................................................................1 <br />Findings..................................................................................................................................................................................................1 <br />Conclusions+ Recommendations........................................................................................................................................................2 <br />Introduction...............................................................................................................................................................................................1 <br />Purposeof Report.................................................................................................................................................................................1 <br />StudyObjectives....................................................................................................................................................................................1 <br />Analysisof Existing Conditions.................................................................................................................................................................1 <br />Location, Zoning, and Land Use...........................................................................................................................................................1 <br />AreaRoadway System...........................................................................................................................................................................2 <br />Existing Traffic Volumes and Analysis Assumptions............................................................................................................................3 <br />PeakHourly Factor............................................................................................................................................................................. <br />10 <br />CrashAnalysis.................................................................................................................................................................................... <br />10 <br />ProposedDevelopment......................................................................................................................................................................... <br />11 <br />SiteTraffic........................................................................................................................................................................................... <br />12 <br />GrowthRate........................................................................................................................................................................................15 <br />Analysisof Future Conditions................................................................................................................................................................ 20 <br />Capacity and Level of Service at Studied Intersections - AM and PM Peak Hours....................................................................... 20 <br />PrincipalFindings...............................................................................................................................................................................55 <br />Conclusions + Recommendations........................................................................................................................................................ 57 <br />APPENDICES <br />Appendix A: Wilkinson Preliminary Plan and North Oaks Farms Site Concept......................................................................................A <br />AppendixB: Project Location Map...........................................................................................................................................................B <br />AppendixC: Intersection Map..................................................................................................................................................................0 <br />Appendix D: Existing Zoning and Future Land Use Maps.......................................................................................................................D <br />Appendix E: Existing and Planned Intersection Control Exhibits............................................................................................................ E <br />Appendix F: Existing (2024) Peak Hour Turning Movement Volume Diagrams.................................................................................... F <br />Appendix G: Existing (2024) Synchro Analysis Worksheets...................................................................................................................G <br />AppendixH: Map and Crash Detail Report..............................................................................................................................................H <br />AppendixI: Internal Capture Charts..........................................................................................................................................................I <br />AppendixJ: Trip Distribution......................................................................................................................................................................J <br />AppendixK: Trip Assignment....................................................................................................................................................................K. <br />Appendix L: Future Scenario Peak Hour Turning Movement Volume Diagrams................................................................................... L <br />Appendix M: Opening Year No Build (2025) Synchro Analysis Worksheets.........................................................................................M <br />Appendix N: Opening Year Build (2025) Synchro Analysis Worksheets............................................................................................... N <br />Appendix 0: Design Year No Build (2045) Synchro Analysis Worksheets.............................................................................................0 <br />Appendix P: Design Year Build (2045) Synchro Analysis Worksheets...................................................................................................P <br />■ Architecture + Engineering + Environmental + Planning Page ii <br />