My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-09-2024 Council Meeting Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
12-09-2024 Council Meeting Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:45:36 PM
Creation date
12/11/2024 4:05:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/09/2024
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
710
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24-30671 ASH STREET TRAFFIC IMPACT STUDY - LINO LAKES, MN <br />EXECUTIVE SUMMARY, CONCLUSIONS, + RECOMMENDATIONS <br />Summary <br />This study has been prepared in anticipation of two proposed mixed used and residential developments along Ash Street in Lino <br />Lakes, MN. The proposed sites, 116 acres total, are currently vacant and anticipated to be developed in two major phases. The <br />sites are located west of Centerville Road along Ash Street between Centerville Road and Holly Drive. The proposed development <br />will consist of the Wilkinson development and the North Oaks Farms development and will include townhomes, retail, apartments, <br />senior adult housing, and single-family residences. <br />The Wilkinson area, consisting of townhomes, retail, apartments, and senior adult housing, would be the first phase and is <br />anticipated to be fully operational in 2025. The North Oaks Farms area, consisting of single-family residences, would be the next <br />phase, and areas would be fully developed by 2045, the Design Year. See Appendix A for a preliminary site plan for the proposed <br />Wilkison development and a preliminary concept for the North Oaks Farms area. <br />This Traffic Impact Study (TIS) studied current, projected, and future traffic conditions at several locations in the City of Lino Lakes, <br />Anoka County, Minnesota. These locations included in the study area are: <br />• Intersection 1 - The intersection of CSAH 21/Centerville Road and CSAH J/Ash Street <br />• Intersection 2 - The intersection of CSAH 21/Centerville Road and CSAH 32/Ash Street <br />• Intersection 3 - The intersection of CSAH 32/Ash Street and Monarch Way/ the North Oaks Farms area's South Access <br />• Intersection 4 - The intersection of CSAH 32/Ash Street and Rapp Farm Blvd <br />• Intersection 5 - The intersection of CSAH 32/Ash Street and Holly Drive N <br />• Intersection 6 - The intersection of Wilkinson Lake Blvd and the Wilkinson area's South Access <br />• Intersection 7 - The intersection of CSAH 32/Ash Street and the Wilkinson area's North Access <br />• Intersection 8 - The intersection of CSAH 32/Ash Street and the North Oaks Farms area's East Access <br />Turning movement traffic count data was collected at Intersections 1-5 above from 6:OOAM - 9:OOAM, and from 3:30PM - 6:30PM <br />on Thursday, July 181", 2024. Traffic was analyzed based on collected data. <br />Findings <br />In the existing condition, the southbound approach at Intersection 1 operates at a level of service F. All other movements operate <br />at a level of service D or better at the study intersections during the Weekday AM and the Weekday PM peak hours. In the existing <br />condition, all existing major intersections operate as stop -controlled. Reconstruction of major intersections is planned for 2025, <br />and Intersection 1 and Intersection 2 are proposed to be converted to roundabouts. <br />Historical traffic volumes in the area have held steady or decreased over the past 20 years; however, traffic forecasts completed <br />in the last 5 years indicate that traffic growth is expected. The proposed developments will account for much of the traffic growth <br />anticipated over the next 20 years, and growth rates were selected to account for background traffic growth separate from traffic <br />growth attributed to the proposed developments. The assumed average annual traffic growth rates used for the future scenarios <br />were the following: <br />■ Architecture + Engineering + Environmental + Planning Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.