Laserfiche WebLink
7 <br />In addition to the criteria established under Section 1007.016, Conditional Use Permits, <br />Section 1007.050, Earth Moving and Land Reclamation establishes the following <br />conditions that shall be met: <br /> <br />1. Properly fence any pit or excavation, and barricade entrances to prevent the general <br />public from depositing garbage or refuse. <br /> <br />The proposed plans indicate earth moving for a stockpile, not a pit. The proposed <br />plans do not currently show any fencing around the earth moving/black dirt stockpile <br />operation or any barricades at the entrance. Staff is proposing that silt fence be <br />placed around the stockpile as a condition of this permit. <br /> <br />2. Slope the banks, and otherwise guard and keep any pit or excavation in such <br />condition as not to be dangerous because of sliding or caving banks. <br /> <br />The existing stockpile slope is 2:1. The stockpile will be required to have a side slope <br />of 3:1 except for the working side. Areas not being excavated shall be established <br />with vegetation within seven (7) days. <br /> <br />3. Properly drain, fill, or level off any pit or excavation so as to make the same safe and <br />healthful as the permitting authority may determine <br /> <br />The proposed earth black dirt stockpile site is designed to drain in a similar manner <br />as the existing conditions. Erosion control is proposed and will be needed to ensure <br />that sediment is prevented from entering the wetland, Hardwood Creek, or adjacent <br />parcels. <br /> <br />4. Limit the depth of such excavation to an elevation no lower than the minimum floor <br />elevation for building construction as established by the City Engineer, so as not to <br />diminish development potential of the parcel. <br /> <br />Not applicable to this project <br /> <br />5. Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like and <br />similar non-decomposable material. Concrete, asphalt, metal, wood, and other <br />debris shall be prohibited. <br /> <br />The project is only proposing stockpiling compost and black dirt. The site will be <br />limited to this type of material. The City will reserve the right to test the material. <br /> <br />6. Require that all decomposable material, or other unsuitable foundation material, be <br />removed from an area before deposition of fill begins. <br /> <br />Not applicable for this project