My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/08/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
01/08/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 2:42:20 PM
Creation date
1/3/2025 2:40:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/08/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />b.Provide details for seed mix, hydro mulch, and application rates within the <br />plan set. <br />6.Maintain slopes of 3:1 on a least 70% of the stockpile area. <br />7.Water suppression, soil binding agents, wind blocks, or other dust suppression <br />methods will be required if dust leaving the site becomes an issue as identified by <br />the City. Obtaining water to be used for dust control is the responsibility of the <br />owner. <br />8.No fill may be placed in adjacent wetlands or in the FEMA floodplain on the site. <br />Stockpile shall not encroach within 50-ft of the wetland boundaries and the FEMA <br />floodplain. <br />a.Mark boundary of wetland directly east of stockpile and gps the location for <br />future verification no fill has been placed. Install conversation signs to <br />identify the adjacent wetland and stockpile limits. <br />9.Owner shall obtain a Rice Creek Watershed District Permit or Letter of Intent as <br />applicable. <br />10.The IUP shall only be valid for five (5) years. The permit may be extended by the City <br />Council following a written request by the applicant submitted at least three months <br />prior to expiration, and review at a public hearing. A new IUP will be needed for <br />work (grading, other material stockpiles, excavation of material, etc.) that is not <br />stated in this IUP. <br />11.The type of stockpile material is limited to topsoil borrow as identified in Minnesota <br />Department of Transportation’s 2020 Standard Specification, Section 3877. Other <br />materials are not allowed and will be required to be removed within 24 hours. <br />12.Owner will permit a City Inspector to view the premises during normal business <br />hours. <br />13. Non-functioning equipment is not allowed to be stored on site. All equipment shall <br />be screened from public view. <br />14.The stockpile shall be used for onsite use only and shall have no commercial or <br />residential sales. <br />ATTACHMENTS <br />1.Engineering and Environmental Review Memos <br />2.Existing and Proposed Site Improvement Plans <br />3.Certificate of Survey <br />4.Applicant’s Narrative
The URL can be used to link to this page
Your browser does not support the video tag.