My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-27-25 - 2- Council WS and Regular Meeting
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
01-27-25 - 2- Council WS and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 12:52:54 PM
Creation date
1/24/2025 12:45:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/27/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6A <br />STAFF ORIGINATOR: Michael Grochala, Community Development Director <br />MEETING DATE: January 27, 2025 <br />TOPIC: Consider Resolution No. 25-11 Awarding Professional Services <br />Contract to Oertel Architects, Public Works Facility Design <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting City Council consideration to award a professional services contract to Oertel <br />Architects to design the new Public Works facility. <br />BACKGROUND <br />Over the past 10 years, the City has been evaluating the construction of a new public works <br />building to replace the existing facility at 1189 Main Street. Constructed in 1971, the buildings <br />are substandard and do not meet the current and future needs of the City. The City Council has <br />continued to express interest in moving forward with the project. <br />The proposed project includes construction of a Public Works Facility on approximately 10.0 <br />acres owned by the City of Lino Lakes at 1189 Main St. A site tour of Hugo's facility was taken in <br />2022 to establish needs and the scope of the project. The council directed staff to move <br />forward with obtaining architectural and engineering services in 2023. Staff has since worked <br />with the finance department to identify potential funding sources. The project was included in <br />the 5-year plan for a 2026 build. The Building and Facilities fund was identified as the funding <br />source for design. <br />The site includes an adjacent 14 acres that includes park improvements and a materials yard. <br />The project will include a public works facility with vehicle storage, vehicle maintenance, and <br />office space, with parking lots, commodity bins, access roads, community meeting space, site <br />work, and utilities. It is anticipated that the new facility will include community meeting space <br />to accommodate election precinct operations, senior events, educational and training <br />functions. The expected budget for this project is approximately $16,400,000. <br />The City Council authorized the advertisement for Request for Proposals on November 12, <br />2024. The City received twelve proposals ranging from $631,000 to $1,230,012, including <br />
The URL can be used to link to this page
Your browser does not support the video tag.