Laserfiche WebLink
FIRM QUALIFICATIONS & EXPERIENCE ON SIMILAR PROJECTS <br />Oertel Architects and our team our uniquely suited to deliver a successful project for <br />the City of Lino Lakes. Every single staff member in our office has worked on numerous <br />public works and maintenance facilities. Our passion and fascination with this type of <br />project has driven our expert qualifications. We are an award -winning public works <br />facility design firm. We have worked on the planning and designing of over 100 <br />separate facilities and comprehensive studies. We are a sought-after resource around <br />the entire Midwest for the planning and design of public works facilities, working <br />on projects in North Dakota, South Dakota, Kansas, Missouri, Iowa, Wisconsin and <br />Michigan. We hope that our resumes indicating our extensive experience show our <br />true dedication to these types of facilities. <br />Our proposed team members will be directly involved with your Public Works project <br />from the initial kick-off meeting until the very end of on -site construction observation. <br />We pride ourselves on keeping the same staffing from project inception through to the <br />end of Construction Administration. This ensures the same people that worked on the <br />initial design can be on the job site to make sure the project maintains the quality and <br />detailing we design for, and to avoid costly changes during construction. Your primary <br />points of contact throughout the design and construction process will be Thomas <br />Stromsodt as Principal in Charge and Dan Greuel as Project Architect. The other main <br />points of contact will be Janneke Schaap (Sustainability) and Brenda Dever (Interiors). <br />All proposed Oertel staff have extensive experience with these types of facility, and <br />directly communicate with each other on a daily basis. If any one of our team members <br />is unavailable for any reason (i.e vacation, sickness, etc.) one of the other team <br />members will be fully committed and capable of providing any services or information <br />which is needed at that time. We have an open studio office environment, which <br />means every employee is aware of all of the other projects in the office. Our firm has <br />weekly office staff meetings to efficiently and effectively manage all of the projects and <br />to ensure they are all successfully completed on time and on budget. We will provide <br />all required coordination with the entire remainder of our proposed team, including <br />our engineers. <br />Quality Assurance and Quality Control are an integral part of our design process, <br />throughout the entire project from the initial Preliminary Design check set to the entire <br />construction process. As we have extensive experience with this project type, we are <br />aware of coordination items which need to be detailed and aligned appropriately to <br />avoid any surprises during construction. Something as seemingly simple as indicating <br />the exact location of your air and water drops, and lube reels on the drawings is <br />something that must be coordinated prior to going out to bid. If they are not indicated <br />exactly where you would like them, you may not have the coverage you were <br />anticipating, or the locations may impede internal traffic flow. Our experience allows us <br />to not only discuss the pros and cons of potential locations for such items, but also to <br />ensure they are included in the drawings exactly where you would like them. <br />As a result of our open office studio environment and our ongoing relationships with <br />our team consultants we are able to quickly and expertly respond to any owner's <br />PROPOSAL FOR PROFESSIONAL SERVICES FOR THE LINO LAKES PUBLIC WORKS FACILITY <br />concerns throughout the entire project. If by chance one of the team members <br />working directly on your project hasn't had experience with the concern you may <br />have, we are able to discuss that concern with others in our office and within our <br />consultant's offices, to come to an educated and experienced resolution. <br />Our expert team manages every project from the initial project initiation through <br />to the end of construction. As mentioned previously, an integral part of that is our <br />quality assurance and quality control process. We also provide review and check sets <br />throughout the design process, with sufficient time for you to review and provide <br />feedback on. This ensures the project moves forward at the appropriate timeline <br />to meet your construction schedule requirements. Our goal is to ensure all design, <br />equipment, traffic, layout options are decided on before moving onto the next phase, <br />beginning with the "big picture" through to the smallest detail. If changes are made <br />during the design process, which there usually are, our goal is to minimize the impact <br />on the previously completed design documents to keep the project on schedule. <br />Sometimes changes are also requested by the owner during the construction project. <br />As a result of having the same team members on the project from the inception <br />through construction we can quickly provide insight into the pros and cons of any <br />changes and coordinate with our internal team and our engineers to provide the most <br />cost-effective means of implementing a successful revision to the project. <br />OERTEL ARCHITECTS- 2 <br />