My WebLink
|
Help
|
About
|
Sign Out
Home
Search
25-016 - Resolution - Shuda Farms - Interim Use Permit
LinoLakes
>
City Council
>
City Council Resolutions
>
2025
>
25-016 - Resolution - Shuda Farms - Interim Use Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 11:04:19 AM
Creation date
2/11/2025 10:57:57 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Resolution #
25-16
Resolution Title
Approving Interim Use Permit for Earth Moving and Stockpiling at Shuda Farms, 8196 20th Avenue
Resolution Summary
Interim Use Permit for Earth Moving and Stockpiling at Shuda Farms, 8196 20th Avenue
Resolution Date Passed
02/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Limit the depth of such excavation to an elevation no lower than the minimum floor <br />elevation for building construction as established by the City Engineer, so as not to <br />diminish development potential of the parcel. <br />Not applicable to this project <br />5. Limit any fill material to clean fill, defined as rocl<, sand, gravel, clay, or other like <br />and similar non -decomposable material. Concrete, asphalt, metal, wood, and other <br />debris shall be prohibited. <br />The project is only proposing stockpiling compost and black dirt. The site will be limited <br />to this type of material. The City will reserve the right to test the material. <br />6. Require that all decomposable material, or other unsuitable foundation material, <br />be removed from an area before deposition of fill begins. <br />Not applicable for this project <br />7. Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br />A site plan showing the existing and proposed grade elevations for the proposed earth <br />moving/ black dirt stockpile was provided. <br />Specify a time when the excavation or land reclamation project shall be completed. <br />The proposed black dirt operations will occur in the summer months. The conditional use <br />permit will be reviewed every five (5) years for renewal. Renewal shall be approved by <br />City Council. <br />9. Place a minimum of four (4) inches of topsoil over the completed project and <br />establish appropriate ground cover within sixty (60) days of completion, or in a time <br />period consistent with the City's stormwater management and pollution prevention <br />plan. <br />The proposed black dirt stockpile shall be seeded or hydromulched within seven (7) days <br />of initial placement. At least 70% of the stockpile shall be established and remain <br />stabilized with vegetation at all times. <br />10. Reimburse the City for the cost of periodic inspections by the City for the purpose <br />of determining that the terms under which the permit has been issued are being <br />complied with. <br />The City will maintain and escrow account for inspections and compliance checks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.