Laserfiche WebLink
Attachment 7: City Engineer letter dated December 20, 2024 <br />wsb <br />Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Diane Hankee PE, Lino Lakes City Engineer <br />Date: December 20, 2024 <br />Re: 416 Lilac Street — BRF Enterprises <br />Site Plan Review <br />027620-000 <br />WSB reviewed the Civil plans for the BRF Enterprises site in Lino Lakes, MN, received December <br />10, 2024. The site is 1.06 acres and located at 416 Lilac Street east of 4th Avenue. The lot has <br />frontage along Lilac Street (TH 49). Comments were made on the following documents: <br />2 • 416 Lilac St — BRF Enterprises - Civil Plans prepared by Plowe Engineering, dated <br />° December 6, 2024, received December 10, 2024. <br />U <br />c� 416 Lilac St — BRF Enterprises - Stormwater Drainage Report prepared by Plowe, dated <br />w December 6, 2024, received December 10, 2024. <br />cSoil Borings and Logs prepared by Haugo Geotechnical Services, dated November 27, <br />2024, received December 10, 2024. <br />0 <br />a The following review comments should be responded to in writing by the applicant <br />co <br />coID <br />Engineering <br />• General <br />0 <br />U) <br />The 416 Lilac Street BRF Enerprises site project proposes to create a professional <br />automotive collision/repair shop which includes the associated parking lot, utilities, and <br />Z landscaping. The site is located on Lot 5 Block 1 of the Lino Industrial Park Addition and will <br />be accessed from Lilac Street (TH 49). <br />J <br />Q <br />a_ <br />• Grading <br />a <br />U) <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />CD <br />retaining walls. <br />N <br />W <br />Comments: <br />1. Remove the impervious area inside the rear drainage and utility easement. <br />2. Recommend including surface water treatment on the south side of the parking area. <br />w 3. Provide Emergency Overflow (EOF) elevations for all low points in the parking or <br />w <br />green space areas. <br />co <br />0) <br />w <br />;° 0 Stormwater Management <br />