My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-24-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
03-24-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:48:12 PM
Creation date
3/21/2025 1:44:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/24/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br />March 24, 2025 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal for Construction Services for 2025 Street Reconstruction and Sewer and Water <br />Extension Project <br />WSB Project No. R-023620-000 <br />Dear Mr. Grochala: <br />WSB & Associates, Inc. is pleased to provide a proposal for construction services associated with <br />the 2025 Street Reconstruction and Sewer and Water Extension Project. This construction <br />services proposal would be subsequent to the City Council awarding the construction contract. <br />The proposed 2025 Street Reconstruction and Sewer and Water Extension Improvements Project <br />o includes the Colonial Woods neighborhood including 62nd Street and Red Maple Lane as well as <br />the Pine Haven neighborhood including 81st Street, Elbe Street, and Danube Street. Diane Street <br />z and Evergreen Trail are also included as overlay projects. <br />w <br />m <br />Scope of Engineering Services <br />WSB is pleased to provide professional construction engineering services for the 2025 Street <br />cc Reconstruction and Sewer and Water Extension Project including contract administration, <br />cc construction observation, construction staking, and public notice and weekly updates for project <br />N stakeholders. Below is a detailed description of the engineering services and WSB's proposed <br />to approach. <br />I. Construction Services <br />a. Project Management/Contract Administration <br />Z Contract Administration includes holding meetings with the contractor & City of Lino <br />Lakes (preconstruction & weekly construction), processing monthly quantities for pay <br />vouchers, and communicating with residents on a weekly basis. <br />a <br />a <br />Z b. Construction Observation <br />a WSB will provide an experienced engineering specialist whose responsibilities will <br />include communicating with the Contactor as an agent of the City, calculating and <br />keeping track of daily construction quantities and costs, contact and meet with <br />N residents as necessary, and work with the Contractor to assist with a quality <br />ui <br />constructed product. <br />Cn c. Construction Staking (Survey) <br />WSB will provide Surveying staff as necessary to provide field staking for necessary <br />w utility alignments, elevations, and any necessary curbing or structure related <br />information during construction. WSB will collect as -built information as necessary <br />= once construction is completed. <br />I— <br />w d. Materials Testing <br />Co <br />6. 20250324 Construction Services Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.