My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-14-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-14-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:52:33 PM
Creation date
4/9/2025 3:42:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/14/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />04/02/2025 <br />Page 2 <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as -bid plans <br />2. Developer/ Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies' scheduling <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />3. Applicant shall Reference the City's General Specification and Standard Detail Plates <br />for Street and Utility Construction and use the City's standard details for GV's and <br />cleanouts. <br />Grading <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br />Comments: <br />1 . Watershed diStFiGt apprEwal fer the City prejeGt 06 Still pending. Additienal stermwate <br />features may he required as a res, -It of the final reviewi <br />(DTC� /2025) NotedWill GGE,rdino+e with City fGr final stp-rmO.A.faze-dc�n. <br />(\NCR 4/2/2025) Watershed permitting for the City p ect is approved no further <br />design changes are anticipated for that element of design <br />7 CaII + II ��,v-fr site m�.�a+ ha d <br />�. n-^vcir-aTr -�.rr vrrr vicm��w�as2r�cr.�in6, eiErSthn�yg-'anrra-proposed. <br />(DT--o/11/2025) EOF Ie,.;+innshaPe-he8A r,;;IredA' It GR-the plans: <br />nn/ea 422025) Gemplete <br />3. Top on GUrb and gutter on islands ef the parking 1c)t fer Building B will result On pended <br />water-, specify top _oi 1t <br />(DTE 311 1 2025) LOcation� ftipped G It c� �rh have been added to the plans. <br />a--�-vmr aunv��`' `' � �arwrsrrtcrv�v �av <br />(VVSB 4/2/2025) Complete <br />n rrJer +n elimipate the retaining wall in the-G#�L hash, <br />(DTG� /2025) Sidewalk location has been revised per the comment and the <br />revised plans p vided by the Gity. <br />(WSB 4/2/2025) Complete <br />Java Properties - Lino Retail 2.0 Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.