Laserfiche WebLink
Ms. Katie Larsen <br />04/02/2025 <br />Page 4 <br />10. Show roof drain routing. Tie into storm sewer at or upstream of a sumped structure to <br />provide pretreatment of roof runoff. <br />(DTE 3/11/2025) The locations of the roof drains will be finalized once tenants have <br />been finalized. <br />(WSB 4/2/2025) Noted, though the locations must still comply with the original <br />comment. <br />Java Properties - Lino Retail 2.0 Engineering Review <br />