My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-14-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-14-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:52:33 PM
Creation date
4/9/2025 3:42:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/14/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />wsb <br />April 8, 2025 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal for Construction Services for Market Place Drive Realignment Project <br />WSB Project No. R-017210-000 <br />Dear Mr. Grochala: <br />WSB & Associates, Inc. is pleased to provide a proposal for construction services associated with <br />the Market Place Drive Realignment Project. This construction services proposal would be <br />subsequent to the City Council awarding the construction contract. <br />The proposed Market Place Drive Realignment Project includes realigning 77th Street between <br />Marilyn Drive and Lake Drive so that the 77th Street aligns with Market Place Drive at Lake Drive. <br />Scone of Enaineerina Services <br />0 <br />Z <br />m The professional construction engineering services for the Market Place Drive Realignment <br />Project includes contract administration, construction observation, construction staking, and <br />public notice and weekly updates for project stakeholders. Below is a detailed description of the <br />engineering services ana vvats s proposea approacn <br />cc <br />to I. Construction Services <br />cc <br />W a. Project Management/Contract Administration <br />Contract Administration includes holding meetings with the contractor & City of Lino <br />Lakes (preconstruction & weekly construction), processing monthly quantities for pay <br />vouchers, and communicating with residents on a daily basis. <br />Z b. Construction Observation <br />WSB will provide an experienced engineering specialist whose responsibilities will <br />include communicating with the Contactor as an agent of the City, calculating and <br />a keeping track of daily construction quantities and costs, contact and meet with <br />Z resiaents as necessary, ana worK witn the contractor to assist witn a quaiity <br />Q constructed product. <br />U) <br />c. Construction Staking (Survey) <br />N WSB will provide Surveying staff as necessary to provide field staking for necessary <br />LU <br />utility alignments, elevations, and any necessary curbing or structure related <br />information during construction. WSB will collect as -built information as necessary <br />co once construction is completed. <br />w d. Materials Testing <br />Of <br />WSB will complete the materials testing on the project in conformance with the City <br />= standard specifications for construction. <br />w <br />Co <br />6. 20250414 Construction Services Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.