Laserfiche WebLink
Lino Lakes City Council Minutes <br />The City Engineer stated that some of the trees marked for removal are due to road and <br />drainage system requirements. She stated that they could re-evaluate the trees along <br />the roadway. They did review the tree plan with a tree expert and also looked at the <br />health of the trees. Oak Wilt was identified in the area. <br />Councilmember Lyden asked if there was anything the city could to regarding the half of <br />the pond that was planned to be drained. <br />The City Engineer stated that could be reviewed, however, there are multiple <br />considerations already with the drainage plan, which is now adding water quality <br />treatment. Half of the area could not tie in based on hydrology. Half is required by Rice <br />Creek Watershed to benefit water quality. <br />Councilmember Cavegn stated that the city requires developers to re -plant and asked if <br />the city would consider re -planting in the project area. <br />The City Engineer stated that she could review this with the Community Development <br />Department. <br />Motion to close the Public Hearing at 7:34 P.M. <br />RESULT: <br />CARRIED [5-0] <br />MOVER: <br />Cavegn <br />SECONDER: <br />Lyden <br />AYES: <br />Rafferty, Cavegn, Lyden, Ruhland and Stoesz <br />NAYS: <br />None <br />Motion to adopt Resolution No. 25-27, Adopting Special Assessments, 2025 Street <br />Reconstruction and Sewer and Water Extension, Colonial Woods. <br />RESULT: CARRIED [5-01 <br />MOVER: Stoesz <br />SECONDER: Ruhland <br />AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz <br />NAYS: None <br />C. 2025 Street Reconstruction and Sewer and Wate Extension Project <br />Motion to adopt Resolution No. 25-31, Accepting Bids and Awarding Contract. <br />RESULT: <br />CARRIED [5-01 <br />MOVER: <br />Lyden <br />SECONDER: <br />Cavegn <br />AYES: <br />Rafferty, Cavegn, Lyden, Ruhland and Stoesz <br />NAYS: <br />None <br />Page 5 of 7 <br />