My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-14-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-14-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:52:33 PM
Creation date
4/9/2025 3:42:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/14/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. On -Site Work. The On -Site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, <br />codes and ordinances of the City. The On -Site Work includes all on -site <br />exterior amenities as shown on the approved Plans and as required by the <br />plan approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, sanitary sewer extension, water system extension, storm <br />drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading and <br />erosion control measures. <br />Such improvements shall be completed in accordance with Section V <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be <br />reviewed by the City, and the City shall establish the actual amount of the <br />financial guarantee. The description and estimated cost of Developer's <br />On -Site Work are as follows: <br />Description of Improvements <br />Estimated <br />Costs <br />1. <br />Lighting <br />$ 20,000.00 <br />2. <br />Fences / Screen Structures <br />$ 0.00 <br />3. <br />Trash Disposal Structures <br />$ 0.00 <br />4. <br />Curbing / Islands / Delineators <br />$ 100,000.00 <br />5 <br />Storm Drainage Systems / Sewers / Catch <br />$ 40,000.00 <br />Basins / Culverts / Swales <br />6. <br />Public Trails and / or Sidewalk <br />$ 0.00 <br />7. <br />Private Trails and / or Sidewalk <br />$ 55,0000.00 <br />8. <br />Driveway / Curb cut / Parking Lot / Fire Lane <br />$ 100,000.00 <br />9. <br />Water mains / Hydrants / Sanitary Sewers <br />$ 60,000.00 <br />10. <br />Landscaping <br />$ 30,000.00 <br />11. <br />Site Grading <br />$ 185,000.00 <br />12. <br />Erosion Control <br />$ 20,000.00 <br />Total Estimated Cost of Developer Improvements <br />$ 610,000.00 <br />Security Requirement (Total * 35%) <br />$ 213,500.00 <br />Ad Site Performance Agreement page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.