Laserfiche WebLink
Lino Lakes City Council Minutes <br />Dolly Carr, 954 815Y Street, Lino Lakes, stated that her neighbor had asked about the <br />markings on the boulevard trees. They also asked how an ambulance can get to the <br />property during the time of construction. <br />The City Engineer stated that the trees are marked along the line for the water and <br />sewer trench. <br />The City Engineer stated that regarding access by an ambulance during construction, the <br />contractor can cover the trench in an emergency. They will need to work with the <br />homeowner during the time the cement is installed as that cannot be driven over, <br />however, it can be installed in sections. <br />Jesse Rodriguez, 8021 Danube Street, Lino Lakes, questioned the extra fee to connect to <br />the sewer system and asked if he was required to connect if his septic system was out of <br />compliance. <br />The City Engineer stated that if the septic system is failing the property owner would <br />need to connect to the sewer system. <br />Motion to Close the public hearing at 6:59 p.m. <br />RESULT: <br />CARRIED [5-0] <br />MOVER: <br />Stoesz <br />SECONDER: <br />Ruhland <br />AYES: <br />Rafferty, Cavegn, Lyden, Ruhland and Stoesz <br />NAYS: <br />None <br />Motion to adopt Resolution No. 25-36, Adopting Special Assessments, 2025 <br />Reconstruction and Sewer and Water Extension, Pine Haven. <br />RESULT: <br />MOVER: <br />SECONDER: <br />AYES: <br />NAYS: <br />CARRIED [5-0] <br />Cavegn <br />Stoesz <br />Rafferty, Cavegn, Lyden, Ruhland and Stoesz <br />None <br />B. Resolution 25-37, 2025 Street Reconstruction and Sewer and Water Extension, <br />Colonial Woods, Special Assessments <br />Mayor Rafferty Opened the Public Hearing on the 2025 Street Reconstruction and Sewer <br />and Water Extension, Colonial Woods, Special Assessments at 7:05 p.m. <br />Caesare and Mark Engstrom, 6250 Red Maple Lane, Lino Lakes, presented a written <br />objection to the proposed assessments. <br />Page 3 of 7 <br />