My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-28-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
04-28-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:43:52 PM
Creation date
4/29/2025 2:38:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/28/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trunk Charge <br />The trunk charge shall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. The Sanitary Sewer Trunk <br />Charge is $1,801.00 per unit. Commercial/Industrial/Institutional (CII) <br />trunk charges are based on a factor of 2.92 units per acre. <br />Availability Charge <br />Commercial/Industrial/Institutional availability charges shall be paid <br />at the time of building permit. Fees are based on the number of <br />sanitary access charge (SAC) units assigned by Metropolitan <br />Council Environmental Services (MCES). <br />City Sewer (CSAC) $1,686.00 Per SAC Unit <br />Trunk sewer unit charges addressed under this paragraph are in <br />addition to any SAC charges imposed by Metropolitan Council <br />Environmental Services. <br />B. Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly <br />distribute the costs of public trunk water infrastructure. The Trunk <br />Utility Connection Fee consists of two components; a Trunk Charge <br />and an Availability Charge. <br />Trunk Charge <br />The trunk charge shall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. The Water Trunk Charge is <br />$2,588.00 per unit. Commercial/Industrial/Institutional (CII) trunk <br />charges are based on a factor of 2.92 units per acre. <br />Availability Charge <br />Commercial/Industrial/Institutional availability charges shall be paid <br />at the time of building permit. Fees are based on the number of <br />sanitary access charge (SAC) units assigned by Metropolitan <br />Council Environmental Services (MCES). <br />City Water (CWAC) $1,628.00 Per SAC Unit <br />C. Surface Water Management Area Charges <br />The City established a trunk area charge to uniformly distribute the <br />416 Lilac Street Site Performance Agreement page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.