Laserfiche WebLink
GENERAL INFORMATION <br />MINNESOTA'S CONSTRUCTION STORMWATER PERMIT IS AN EXTENSION OF THE NATIONAL POLLUTION <br />DISCHARGE ELIMINATION SYSTEM STORMWATER PROGRAM, WHICH IS PART OF THE FEDERAL CLEAN <br />WATER ACT. REGULATED PARTIES MUST DEVELOP A STORMWATER POLLUTION PREVENTION PLAN <br />(SWPPP). THE SWPPP PROVIDES INFORMATION ON THE EXISTING AND PROPOSED SITE <br />CONDITIONS, CONTROL MEASURES FOR STORMWATER POLLUTION PREVENTION BEFORE, DURING AND <br />AFTER CONSTRUCTION, INSPECTION, MAINTENANCE AND INFORMATION RELATED TO THE <br />PERMANENT STORMWATER MANAGEMENT SYSTEM. THE SWPPP SHALL BE KEPT ON SITE AT ALL <br />TIMES DURING ACTIVE CONSTRUCTION. <br />PROJECT INFORMATION <br />PROJECT NAME: REHBEIN BLACK DIRT <br />PROJECT LOCATION: LINO LAKES, ANOKA COUNTY, MINNESOTA <br />PROJECT OWNER: GERALD PROPERTIES <br />SWPPP DESIGN <br />DESIGNER NAME: JOSEPH T. RADACH, PE <br />TRAINING DOCUMENTATION: U OF MN DESIGN OF CONST. SWPPP (EXPIRES 5/31/23) <br />RESPONSIBLE PARTIES <br />THE OWNER MUST IDENTIFY A PERSON KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION <br />OF EROSION PREVENTION AND SEDIMENT CONTROL BMP'S WHO WILL OVERSEE THE <br />IMPLEMENTATION OF THE SWPPP, AND THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE <br />EROSION PREVENTION AND SEDIMENT CONTROL BMP'S. <br />SITE MANAGER: <br />TRAINING DOCUMENTATION: <br />INSPECTION REPRESENTATIVE: <br />TRAINING DOCUMENTATION: <br />SWPPP SHEETS <br />THE SWPPP CONSISTS OF SHEETS C1, C2, AND C3. SEDIMENT AND EROSION <br />CONTROL NOTES ARE ON SHEET C1, NARRATE ON SHEET C2, AND DETAILS ON <br />SHEET C3. <br />EXISTING SITE CONDITIONS <br />THE SITE IS LOCATED IN THE NORTHEAST QUADRANT OF 21ST AVENUE SOUTH AND COMMERCE <br />DRIVE IN LINO LAKES, ANOKA COUNTY, MINNESOTA. THE SITE IS BOUNDED ON THE SOUTH BY <br />AGRICULTURAL LAND, ON THE WEST BY 21ST AVENUE SOUTH, ON THE NORTH BY NORTHERN <br />LIGHTS BOULEVARD AND A DAIRY QUEEN RESTUARANT, AND ON THE EAST BY AGRICULTURAL <br />LAND AND INTERSTATE 35E. THE SITE IS CURRENTLY UNDEVELOPED AND USED FOR <br />AGRICULTURAL PURPOSES. <br />THE PROPOSED SITE BOUNDARY CONSISTS OF 9.37 ACRES. THERE ARE NO EXISTING IMPERVIOUS <br />SURFACES ON SITE. THE SITE IS RELATIVELY FLAT, WITH ELEVATIONS RANGING FROM 909 IN THE <br />NORTH AND CENTRAL PORTIONS OF THE SITE, DOWN TO ABOUT 902 IN THE SOUTH. <br />STORMWATER FROM THE SITE GENERALLY DRAINS FROM NORTH TO SOUTH AND ULTIMATELY TO <br />CLEARWATER CREEK. THERE ARE TWO WETLANDS WITHIN THE SITE BOUNDARY, ONE ON THE <br />NORTH EDGE OF THE SITE AND ONE ON THE SOUTH EDGE OF THE SITE. <br />PROPOSED SITE CONDITIONS <br />REHBEIN PROPERTIES PLANS ON USING THE SITE FOR BLACK DIRT STOCKPILING, SCREENING, AND <br />SELLING. A DRIVEWAY ACCESS WILL BE ADDED TO 21ST AVENUE SOUTH TO SERVE THE SITE, <br />AND A GRAVEL PAD WILL BE CONSTRUCTED TO USE FOR LOADING OF TRUCKS. DURING <br />CONSTRUCTION, APPROXIMATELY 4.3 ACRES WILL BE DISTURBED. THE PROPOSED CONSTRUCTION <br />WILL CREATE APPROXIMATELY 0.220 ACRES OF IMPERVIOUS, OR ABOUT 9,600 SQUARE FEET. <br />DRAINAGE PATTERNS ONSITE WILL MIMIC EXISTING CONDITIONS, WITH STORMWATER DRAINING <br />SOUTH TO A SERIES OF WETLANDS BEFORE DRAINING TO CLEARWATER CREEK. BECAUSE THE <br />SITE PROPOSES TO CREATE LESS THAN 10,000 SQUARE FEET OF IMPERVIOUS, NO STORMWATER <br />TREATMENT PRACTICES ARE REQUIRED. <br />SOIL INFORMATION <br />IN OCTOBER OF 2021, HAUGO GEOTECHNICAL SERVICES DRILLED FOUR SOIL BORINGS TO <br />APPROXIMATE NEAR SURFACE SOILS. THE BORINGS INDICATE THAT NEAR SURFACE SOILS <br />CONSIST PRIMARILY OF SANDY LEAN CLAY WITH AREAS OF SILTY SAND. THE SOILS GENERALLY <br />FALL WITHIN THE HYDROLOGIC SOIL GROUP "D", BUT CERTAIN AREAS MAY FALL WITHIN THE <br />HYDROLOGIC SOIL GROUP "B". GROUNDWATER WAS FOUND IN ONE OF THE BORINGS AT AN <br />ELEVATION OF ABOPUT 899. <br />WETLAND CONSIDERATIONS <br />THERE ARE TWO WETLANDS ONSITE, ONE ON THE NORTH EDGE OF THE SITE AND ONE ON THE <br />EAST EDGE OF THE SITE. THERE ARE OTHER WETLANDS LOCATED JUST OUTSIDE THE PROPERTY <br />BOUNDARY. THERE IS NO PROPOSED DISTURBANCE WITHIN 50 FEET OF ANY WETLANDS. <br />STORMWATER RECEIVING WATERS <br />ALL STORMWATER FROM THE SITE ULTIMATELY DRAINS TO CLEARWATER CREEK. <br />SPECIAL/IMPAIRED WATER CONSIDERATIONS <br />CLEARWATER CREEK IS AN IMPAIRED WATER AND IS WITHIN 800-FEET OF THE SITE. ADDITIONAL <br />BMPS INCLUDE: IMMEDIATE STABILIZATION OF EXPOSED SOIL AREAS, AND COMPLETE <br />STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS AFTER CONSTRUCTION ACTIVITY IN THAT <br />PORTION OF THE SITE TEMPORARILY OR PERMANENTLY CEASES, AND TEMPORARY SEDIMENTATION <br />BASINS FOR COMMON DRAINAGE AREAS OF FIVE (5) ACRES OR MORE. <br />STORMWATER MANAGEMENT PLAN <br />THE MPCA REQUIRES SITES TO PROVIDE A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF <br />FROM NEWLY CREATED IMPERVIOUS SURFACES GREATER THAN OR EQUAL TO ONE ACRE. RCWD <br />REQUIRES SITES TO PROVIDE A WATER QUALITY VOLUME OF 1.1 INCHES OF RUNOFF FROM NEWLY <br />CREATED IMPERVIOUS SURFACES GREATER THAN OR EQUAL TO 10,000 SQUARE FEET. BECAUSE <br />THE SITE PROPOSED TO CREATE 9,600 SQUARE FEET OF IMPERVIOUS, NO STORMWATER <br />TREATMENT FACILITIES ARE REQUIRED. NATURAL BUFFER STRIPS WILL BE MAINTAINED AROUND <br />THE SITE AND SILT FENCE WILL BE USED TO CONTROL SEDIMENT. <br />PRIOR TO START OF CONSTRUCTION <br />THE FOLLOWING STORMWATER POLLUTION PREVENTION MEASURES SHALL BE IMPLEMENTED PRIOR <br />TO CONSTRUCTION. REFER TO GRADING AND EROSION CONTROL PLANS FOR LOCATIONS. <br />1. SILT FENCE <br />SILT FENCE SHALL BE INSTALLED AT THE LIMIT OF GRADING ON ANY FILL SLOPE. ADDITIONAL <br />SILT FENCE MAY BE REQUIRED IN CUT SLOPE AREAS. SILT FENCE SHALL ALSO BE INSTALLED <br />AROUND ANY INFILTRATION/FILTRATION PRACTICE. <br />2. ROCK CONSTRUCTION ENTRANCE <br />ROCK CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE FIELD ENTRANCES TO THE <br />SITE. <br />3. CATCH BASINS <br />ALL CATCH BASINS SHALL BE PROTECTED WITH INLET PROTECTION DEVICES APPROVED BY THE <br />LOCAL GOVERNING UNIT. THESE SHALL INCLUDE, BUT ARE NOT LIMITED TO, WIMCO <br />PROTECTION DEVICES, INFRASAFE PROTECTION DEVICES, FILTER FABRIC, BIO ROLLS AND STRAW <br />BALES. <br />4. TEMPORARY SEDIMENTATION BASIN <br />WHERE FIVE (5) OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATION, A <br />TEMPORARY (OR PERMANENT) SEDIMENT BASIN MUST BE PROVIDED PRIOR TO RUNOFF LEAVING <br />THE CONSTRUCTION SITE OR ENTERING SURFACE WATERS. THE TEMPORARY (OR PERMANENT) <br />BASINS MUST BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT WITH THE START OF <br />SOIL DISTURBANCE THAT IS UPGRADIENT OF THE AREA AND CONTRIBUTES RUNOFF TO THE <br />BASIN. WHERE THE TEMPORARY SEDIMENT BASIN IS NOT ATTAINABLE DUE TO SITE <br />LIMITATIONS, EQUIVALENT SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS, AND/OR <br />SEDIMENT TRAPS, SILT FENCES, VEGETATIVE BUFFER STRIPS OR ANY APPROPRIATE <br />COMBINATION OF MEASURES ARE REQUIRED FOR ALL DOWN SLOPE BOUNDARIES OF THE <br />CONSTRUCTION AREA AND FOR THOSE SIDE SLOPE BOUNDARIES DEEMED APPROPRIATE AS <br />DICTATED BY INDIVIDUAL SITE CONDITIONS. IN DETERMINING WHETHER INSTALLING A SEDIMENT <br />BASIN IS ATTAINABLE, THE PERMITTEE(S) MUST CONSIDER PUBLIC SAFETY AND MAY CONSIDER <br />FACTORS SUCH AS SITE SOILS, SLOPE AND AVAILABLE AREA ON SITE. THE BASIN MUST BE <br />DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF PART III.C. OF THE MPCA <br />CONSTRUCTION STORMWATER PERMIT. <br />DURING CONSTRUCTION <br />THE FOLLOWING STORMWATER POLLUTION PREVENTION MEASURES SHALL BE IMPLEMENTED DURING <br />CONSTRUCTION. REFER TO GRADING AND EROSION CONTROL PLANS FOR LOCATIONS. <br />1. PHASED GRADING <br />TO THE EXTENT POSSIBLE, GRADING SHALL BE PHASED TO MINIMIZE THE AMOUNT OF <br />DISTURBED AREAS DURING SITE CONSTRUCTION. <br />2. TRACKED SEDIMENT <br />ANY SEDIMENT TRACKED FROM THE SITE ONTO THE STREET SHALL BE REMOVED IMMEDIATELY <br />UPON DETECTION. THE ROCK CONSTRUCTION ENTRANCE SHALL BE INSPECTED AND REPAIRED <br />IF INUNDATED WITH SEDIMENT. <br />3. STOCKPILES <br />STOCKPILES SHALL BE PLACED IN AN AREA THAT WILL MINIMIZE THE NEED FOR RELOCATION. <br />IF A STOCKPILE WILL REMAIN IN PLACE FOR AN EXTENDED PERIOD OF TIME, STABILIZATION <br />MEASURES SHALL BE IMPLEMENTED, INCLUDING BUT NOT LIMITED TO, SEEDING AND SILT <br />FENCING. TEMPORARY STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT <br />CONTROLS AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER <br />CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, CONDUITS OR DITCHES. <br />4. TOPSOIL <br />UPON GRADING COMPLETION, A MINIMUM OF 6 INCHES OF TOPSOIL SHALL BE PLACED OVER <br />ALL DISTURBED AREAS, EXCLUDING PROPOSED STREETS AND PARKING AREAS. <br />5. DECOMPACTION <br />SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING DISTURBED PERVIOUS <br />AREAS MUST BE DECOMPACTED THROUGH SOIL AMENDMENT AND/OR RIPPING TO A DEPTH OF <br />18 INCHES WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS AND OTHER EXISTING <br />VEGETATION PRIOR TO FINAL REVEGETATION OR OTHER STABILIZATION. <br />6. RESTORATION <br />ALL DISTURBED AREAS NOT ACTIVELY WORKED SHALL BE RESTORED WITH SEED AND MULCH, <br />EROSION CONTROL BLANKET AND/OR SOD WITHIN 7 DAYS. <br />7. SLOPES <br />IN ORDER TO MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, THERE SHALL BE <br />NO UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET FOR SLOPES WITH A GRADE OF 3:1 <br />OR STEEPER. <br />8. DRAINAGE DITCHES <br />THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT <br />DRAINS WATER FROM THE SITE, OR DIVERTS WATER AROUND THE SITE, MUST BE STABILIZED <br />WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO <br />ANY SURFACE WATER. STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF <br />CONNECTING TO A SURFACE WATER. <br />9. PIPE OUTLETS <br />PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. <br />10. CATCH BASINS <br />ALL CATCH BASINS SHALL BE PROTECTED WITH INLET PROTECTION DEVICES APPROVED BY THE <br />LOCAL GOVERNING UNIT. THESE SHALL INCLUDE, BUT ARE NOT LIMITED TO, WIMCO <br />PROTECTION DEVICES, INFRASAFE PROTECTION DEVICES, FILTER FABRIC, BIO ROLLS AND STRAW <br />BALES. <br />11. DUST <br />CONSTRUCTION DUST SHALL BE CONTAINED TO THE EXTENT POSSIBLE. IF THE SITE BECOMES <br />EXCESSIVELY DUSTY, APPROPRIATE MEASURES SHALL BE TAKEN TO REDUCE DUST BEING <br />TRANSPORTED FROM THE SITE. DUST CONTROL MEASURES INCLUDE, BUT ARE NOT LIMITED <br />TO, WATERING AND CALCIUM CHLORIDE APPLICATION. <br />12. DEWATERING <br />DEWATERING ACTIVITIES SHALL BE CONDUCTED WITH AND APPROVED BY THE LOCAL <br />GOVERNING UNIT. IF THERE WILL BE ANY DEWATERING OR BASIN DRAINING THAT MAY HAVE <br />TURBID OR SEDIMENT LADEN DISCHARGE, THE WATER MUST BE DISCHARGED TO A TEMPORARY <br />OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER POSSIBLE. <br />APPROPRIATE BMPS SHALL BE USED FOR EROSION AND SEDIMENT CONTROL AND ENERGY <br />DISSIPATION. <br />13. CONSTRUCTION MATERIALS AND DEBRIS <br />CONSTRUCTION MATERIALS SHALL BE STORED IN AN ORDERLY MANNER AND IN AN AREA <br />THAT WILL MINIMIZE CONFLICTS WITH OTHER CONSTRUCTION ACTIVITIES. CONSTRUCTION <br />DEBRIS SHALL BE CONTAINED IN DUMPSTERS AND REMOVED FROM THE SITE AS NECESSARY. <br />14. CHEMICALS <br />CHEMICALS SHALL BE STORED IN A SAFE AREA IN SEALED CONTAINERS WITH THE ORIGINAL <br />LABELING AND MATERIAL SAFETY DATA SHEETS AVAILABLE. <br />15. SPILLS AND CONTAMINATION <br />IF FUEL, OIL OR A HAZARDOUS CHEMICAL IS SPILLED OR DETECTED DURING CONSTRUCTION <br />ACTIVITIES, ALL APPROPRIATE AGENCIES SHALL BE IMMEDIATELY NOTIFIED, INCLUDING, BUT <br />NOT LIMITED TO, THE MINNESOTA DUTY OFFICER AT 800-422-0798. <br />16. CONCRETE WASHOUT AREA <br />PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES <br />GENERATED BY WASHOUT OPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, <br />CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE CONSTRUCTION <br />ACTIVITY. PERMITTEES MUST PREVENT LIQUID AND SOLID WASHOUT WASTES FROM CONTACTING <br />THE GROUND AND MUST DESIGN THE CONTAINMENT SO IT DOES NOT RESULT IN RUNOFF FROM <br />THE WASHOUT OPERATIONS OR AREAS. PERMITTEES MUST PROPERLY DISPOSE LIQUID AND <br />SOLID WASTES IN COMPLIANCE WITH MPCA RULES. PERMITTEES MUST INSTALL A SIGN <br />INDICATING THE LOCATION OF THE WASHOUT FACILITY. <br />POST CONSTRUCTION <br />WHEN THE SITE HAS BEEN COMPLETELY CONSTRUCTED, THE SITE MUST UNDERGO FINAL <br />STABILIZATION. FINAL STABILIZATION OCCURS WHEN ALL OF THE GRADING, INFRASTRUCTURE AND <br />BUILDING ACTIVITIES HAVE BEEN COMPLETED. TO ACHIEVE FINAL STABILIZATION, THE FOLLOWING <br />MEASURES SHALL BE COMPLETED. <br />1. ALL DISTURBED AREAS WITHOUT PERMANENT IMPERVIOUS SURFACES SHALL BE DECOMPACTED <br />AND STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER. AREAS NOT REQUIRING SOD <br />OR EROSION CONTROL BLANKET SHALL BE SEEDED AND MULCHED. <br />2. SEDIMENT FROM CONVEYANCES AND TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE <br />USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS SHALL BE CLEANED OUT. <br />SEDIMENTATION BASINS SHALL BE SUFFICIENTLY CLEANED OUT TO RETURN THE BASIN TO <br />DESIGN CAPACITY. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED <br />BACK INTO THE BASIN OR CONVEYANCES DISCHARGING OFF -SITE OR TO SURFACE WATERS. <br />3. WHEN STABILIZED VEGETATION HAS BEEN ESTABLISHED OVER 70 PERCENT OF THE PERVIOUS <br />SURFACE AREA, ALL SYNTHETIC TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES <br />SHALL BE REMOVED BY THE CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO, SILT <br />FENCE, TREE FENCE AND CATCH BASIN INLET PROTECTION DEVICES. <br />NOTICE OF TERMINATION <br />THE PERMITEE(S) MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA WITHIN 30 DAYS <br />AFTER FINAL STABILIZATION IS COMPLETE, OR ANOTHER OWNER/OPERATOR (PERMITTEE) HAS <br />ASSUMED CONTROL OVER ALL AREAS OF THE SITE THAT HAVE NOT UNDERGONE FINAL <br />STABILIZATION. <br />INSPECTIONS & RECORD KEEPING <br />THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES <br />AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL STABILIZATION MEASURES EVERY <br />DAY WORK IS PERFORMED ON THE SITE AND AT LEAST WEEKLY UNTIL LAND -DISTURBING ACTIVITY <br />HAS CEASED. THEREAFTER, THE PERMITTEE MUST PERFORM THESE RESPONSIBILITIES AT LEAST <br />WEEKLY UNTIL VEGETATION COVER IS ESTABLISHED. THE PERMITTEE SHALL MAINTAIN A LOG OF <br />THESE ACTIVITIES, WHICH MUST BE AVAILABLE FOR INSPECTION UPON REQUEST. <br />1. RECORD NAME OF INSPECTOR AND DATE AND TIME OF INSPECTION. <br />2. RECORD RAINFALL AMOUNT SINCE MOST RECENT INPPECTION. <br />3. INSPECT ROCK CONSTRUCTION ENTRANCES FOR SEDIMENTATION. INSPECT ADJACENT STREETS <br />FOR SEDIMENT TRACKING. <br />4. INSPECT SITE FOR EXCESSIVE EROSION AND SEDIMENT ACCUMULATION. <br />A. INSPECT SILT FENCE AND OTHER TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES <br />B. INSPECT FLARED END SECTIONS FOR EROSION AND SEDIMENTATION. <br />C. INSPECT PONDS, INFILTRATION BASINS, TEMPORARY SEDIMENTATION BASINS AND ALL <br />OTHER BMP'S FOR EROSION AND SEDIMENTATION. <br />D. INSPECT SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS <br />FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. <br />5. INSPECT SITE AND ADJACENT PROPERTIES FOR CONSTRUCTION DEBRIS, TRASH AND SPILLS. <br />6. INSPECT STABILIZED AREAS FOR EROSION. <br />7. RECORD RECOMMENDED REPAIRS, MAINTENANCE AND/OR REPLACEMENTS REQUIRED TO ENSURE <br />EROSION AND SEDIMENTATION CONTROL MEASURES ARE SUFFICIENT. <br />8. RECORD RECOMMENDED AMENDMENTS TO THE SWPPP. <br />9. RECORD REPAIRS, MAINTENANCE AND/OR REPLACEMENTS THAT WERE COMPLETED SINCE THE <br />LAST INSPECTION. <br />MAINTENANCE <br />THE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, INSPECTION AND MAINTENANCE <br />OF ALL STORMWATER POLLUTION PREVENTION MEASURES FOR THE DURATION OF THE PROJECT. <br />THE FOLLOWING GUIDELINES SHALL BE USED TO DETERMINE NECESSARY REPAIRS, MAINTENANCE <br />AND/OR REPLACEMENT OF THE EROSION AND SEDIMENTATION CONTROL MEASURES. <br />1. ROCK CONSTRUCTION ENTRANCES SHALL BE REPAIRED OR REPLACED IF THE ROCK BECOMES <br />INUNDATED WITH SEDIMENT AND/OR EXCESSIVE SEDIMENT IS BEING TRACKED FROM THE SITE. <br />SEDIMENT TRACKED ONTO ADJACENT STREETS SHALL BE REMOVED. MEASURES SHALL BE <br />TAKEN IMMEDIATELY UPON DISCOVERY. <br />2. SILT FENCE SHALL BE REPAIRED OR REPLACED WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF <br />THE SILT FENCE, THE SILT FENCE IS DAMAGED AND/OR THE SILT FENCE BECOMES <br />NONFUNCTIONAL. MEASURES SHALL BE TAKEN WITHIN 24 HOURS OF DISCOVERY. <br />3. CATCH BASIN INLET PROTECTION DEVICES SHALL BE CLEANED WHEN SEDIMENT REACHES 4 THE <br />HEIGHT OF THE SEDIMENT TRAP AND/OR REPAIRED OR REPLACED IF THE DEVICE BECOMES <br />NONFUNCTIONAL. MEASURES SHALL BE TAKEN WITHIN 72 HOURS OF DISCOVERY. <br />4. FLARED END SECTIONS SHALL BE CLEANED IF DEBRIS IS RESTRICTING FLOW OR IF SEDIMENT <br />HAS ACCUMULATED AT THE OUTLET. IF A FLARED END SECTION BECOMES NONFUNCTIONAL <br />OR DAMAGED, IT SHALL BE REPAIRED OR REPLACED. MEASURES SHALL BE TAKEN WITHIN 72 <br />HOURS OF DISCOVERY. <br />5. IF SEDIMENT IS OBSERVED OFF -SITE OR NEAR SURFACE WATERS, THE SOURCE OF SEDIMENT <br />SHALL BE DETECTED AND ADDITIONAL MEASURES SHALL BE IMPLEMENTED. THE PERMITEE(S) <br />SHALL COORDINATE SEDIMENT RETRIEVAL FROM SURFACE WATERS WITH ALL APPROPRIATE <br />AGENCIES. MEASURES SHALL BE TAKEN WITHIN 7 DAYS OF DISCOVERY. <br />6. PONDS, INFILTRATION BASINS, TEMPORARY SEDIMENTATION BASINS AND ALL OTHER BMP'S <br />SHALL BE CLEANED IF DEBRIS IS PRESENT AND/OR EXCESSIVE SEDIMENTATION HAS <br />OCCURRED. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND <br />THE SEDIMENT REMOVED WHEN SEDIMENT HAS FILLED THE BASIN TO 1/2 THE STORAGE <br />VOLUME. NO SEDIMENT SHALL BE ALLOWED TO ACCUMULATE IN INFILTRATION BASINS. <br />MEASURES SHALL BE TAKEN WITHIN 72 HOURS OF DISCOVERY. <br />QUANTITIES <br />THE FOLLOWING TABLE PROVIDES ESTIMATED QUANTITIES FOR STORMWATER POLLUTION <br />PREVENTION THROUGHOUT THE PROJECT. <br />ITEM <br />UNIT <br />ESTIMATED <br />QUANTITY <br />ROCK ENTRANCE <br />EA. <br />1 <br />SILT FENCE/BIO-ROLLS <br />L.F. <br />1,900 <br />INLET PROTECTION <br />EA. <br />2 <br />TURF ESTABLISHMENT <br />AC. <br />4.0 <br />J <br />a <br />ZW <br />f <br />j <br />0 <br />W z <br />z W <br />Z <br />1E <br />z <br />jo <br />z <br />I > <br />z <br />La <br />z <br />z <br />W <br />W <br />Q <br />z <br />0 <br />7P <br />Uj <br />~ <br />/ <br />L <br />JQ <br />w <br />> <br />LL <br />z <br />J <br />w <br />W <br />' <br />~ <br />a <br />O <br />Ln <br />N <br />J <br />� <br />a <br />Z <br />o0 <br />N <br />a <br />Zo <br />a <br />MJ <br />a <br />m° <br />C <br />Ljj <br />W <br />� z <br />N 00 <br />W z M <br />a�Ln <br />0 > Ln <br />OC Q z <br />a�2: <br />N <br />Z O <br />FBI Ln 0) <br />LJ N <br />= <br />m <br />LU <br />Ce <br />REVISIONS <br />1. 04/06/22 <br />Per City/RCWD Comments <br />DRAWN BY: <br />JTR <br />DESIGNED <br />BY: <br />JTR <br />ISSUE DATE: <br />01/10/22 <br />I hereby certify that this plan, specification <br />or report was prepared by me or under <br />my <br />direct supervision and that I am a duly <br />Licensed Professional <br />Engineer under <br />the <br />laws of the State <br />of Minnesota <br />Name: <br />Joseph T. Radach, P.E. <br />Signature: <br />�x <br />Date: 01/10/22 License #: 45889 <br />C2 <br />of <br />3 <br />