My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-07-2025 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2025 Park Board Packets
>
05-07-2025 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:56:11 PM
Creation date
5/1/2025 2:55:40 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/07/2025
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />DATE: May 7, 2025 <br /> <br />TO: Park Board <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />TOPIC: Discuss Replacing Lino Park Shelter <br /> <br /> <br />The Park Board directed staff to explore the potential replacement of the Lino Park shelter that <br />was built in 1986. <br /> <br />Staff is recommending a Poligon Tiara 25’ x 37’ structure. This is a two tier, “extended hex” design <br />that fits the space well and provide plenty of space for tables. The roof is a 5:12 pitch metal roof <br />with stained tongue and groove wood on the underside. <br /> <br />The Parks Department will take care of demolition and site prep. The project cost breakdown is as <br />follows: <br /> <br />25’ x 27’ Poligon Tiara Shelter $68,414 <br />Concrete – 6 footings, 30’ x 46’ slab $25,910 <br />Installation of Shelter $33,000 <br />TOTAL $127,324 <br /> <br />If we move forward, enhancements including masonry work around the footings and electrical <br />work will be explored. <br /> <br /> <br /> <br />Attachments <br />Poligon Drawing Sheets (5) <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.