Laserfiche WebLink
Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal <br />DENSITY <br />The total site area is 59.30 acres with 5.62 acres of wetlands and 5.18 acres of wetland buffers. The <br />planned density for this area is 1.6-3 units per acre. Netting out wetlands and wetland buffers, we are <br />proposing a density of 1.98 units per acre, well below the maximum -allowed density. PUD flexibility and the <br />R-2 zoning lot standards are necessary to meet the minimum density allowed in the City's Comprehensive Plan <br />and to minimize tree removal. It is not possible to meet the minimum density with 80-foot lots given the <br />wetlands and their required buffers, as well as the gas line easement. With this site plan, 80-foot lots would <br />yield 69 lots as shown in the Yield Plan Density Exhibit, which would result in a density of 1.41 units per acre, <br />which is well below the minimum density planned for this area. Furthermore, these larger lots would result in <br />greater tree removal. <br />TREE PRESERVATION AND OPEN SPACE <br />As mentioned above, we have designed our neighborhood plan to conserve as many trees as possible. Of the <br />6,494 trees on the site, we are saving 3,060 trees: almost 50%. We are proposing to preserve these trees in <br />permanent open space to be dedicated to the City for public park, or as open space to be owned by the <br />HOA. Given the extensive dedication of open space/park for permanent tree preservation, we are <br />requesting that the City accept the land dedication and tree preservations areas or allow the space to be <br />owned by the HOA and protected by a conservation easement and left natural in lieu of paying tree <br />restitution. As part of this request, M/I Homes will agree to plant three trees per home for a total tree <br />replacement of 279 trees. The Environmental Board, Planning Commission, and Council agreed during the <br />revised concept plan review that this flexibility should be granted. <br />We are proposing this for a number of reasons. First, the proposed plan preserves a little over 58% open <br />space, conserving as many trees as possible. This is a heavily wooded site that is guided for a density of 1.6- <br />3 units per acre, and we are proposing a very low density, almost near the lowest density allowed. <br />Additionally, almost 50% of the trees on site are Quaking Aspen, which do not survive long due to Cankers, <br />which will kill the trees in 3-8 years. Finally, we have received extensive feedback from the residents of <br />Arena Acres regarding the preservation of trees on this land. The dedication of public land would allow them <br />to enjoy this land and the trees that are being preserved. If the City chooses not to accept the land <br />dedication, an alternative option would be to place a deed restriction on the open space area prohibiting the <br />removal of trees, and the land would be left in its natural state. The HOA would own the open space <br />property. <br />ELEVATIONS <br />Example elevations of our villa product have been provided. These are just an example of the many <br />elevations we offer. We also have anti -monotony requirements to ensure that very similar elevations are not <br />adjacent to one another within the community to preserve visual interest. <br />TIMING <br />We plan to begin grading the site in late spring/early summer after approval of preliminary plat and other <br />applicable agency approvals. We understand a grading -only development agreement will be required in <br />order to accomplish this and therefore request that this agreement be reviewed concurrently with this <br />Preliminary Plat and PUD application. Installation of utilities will occur when final plat has been approved and <br />all conditions of final plat approval have been met. A phasing plan has been provided and is in draft form. <br />The phasing plan will ensure that the lift station is up and running with the first phase of the development. <br />Page 6 <br />