My WebLink
|
Help
|
About
|
Sign Out
Home
Search
25-052 - Resolution - Rehbieins - Stockpiling Permit
LinoLakes
>
City Council
>
City Council Resolutions
>
2025
>
25-052 - Resolution - Rehbieins - Stockpiling Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 12:40:17 PM
Creation date
5/13/2025 11:22:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
04/28/2025
Resolution #
25-52
Resolution Title
Resolutin Approving Interim Use Permit for Earth Moving and Stockpiling at Rehbeins Black Dirt (PIDS #24-31-22-24-0002, #24-31-22-24-0008, and #24-31-22-24-0009)
Resolution Summary
Resolutin Approving Interim Use Permit for Earth Moving and Stockpiling at Rehbeins Black Dirt
Resolution Date Passed
04/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like and <br />similar non -decomposable material. Concrete, asphalt, metal, wood, and other <br />debris shall be prohibited. <br />The project is only proposing stockpiling black dirt. The site will be limited to this type <br />of material. The City will reserve the right to test the material. <br />(f) Require that all decomposable material, or other unsuitable foundation material, be <br />removed from an area before deposition of fill begins. <br />Not applicable to this project. <br />(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br />A site plan showing the existing and proposed grade elevations for the proposed <br />earth moving/ black dirt stockpile was provided. <br />(h) Specify a time when the excavation or land reclamation project shall be completed. <br />The proposed earth moving/ black dirt operations will occur in the summer months. <br />The interim use permit will be reviewed every five (5) years for renewal. Renewal <br />shall be approved by City Council. <br />(i) Place a minimum of four (4) inches of top soil over the completed project and <br />establish appropriate ground cover within sixty (60) days of completion, or in a time <br />period consistent with the City's stormwater management and pollution prevention <br />plan. <br />The proposed black dirt stockpile shall be seeded or hydromulched within seven (7) <br />days of initial placement. At least 70% of the stockpile shall be stabilized and remain <br />stabilized with vegetation at all times. <br />(j) Reimburse the City for the cost of periodic inspections by the City for the purpose of <br />determining that the terms under which the permit has been issued are being <br />complied with. <br />The City will maintain a $5,000 non -interest bearing escrow account provided by the <br />owner that shall be reestablished annually by January 151. This escrow will be for <br />inspection, erosion control, and other City costs associated with the operation of the <br />stockpile. <br />
The URL can be used to link to this page
Your browser does not support the video tag.