Laserfiche WebLink
CARLSON ENGINEERING <br />PHEASANT RODE DR NE <br />SUITE 100 <br />I hereby certify that this plan, specification <br />or report was prepared by me or under my <br />BLAINE. MN SFA49 <br />SURVEYING <br />TEL 76K4M791 <br />direct supervision and that I am a duly <br />ENGINEERING PLANNING <br />FAX763.4W75� <br />Licensed Landscape Architect under <br />CAARLSON-ENGNEERINGMM <br />the laws of the State of Minnesota <br />LANDSCAPE SPECIFICATIONS <br />1. TREE PROTECTION. ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL REMAIN PROTECTED AND <br />UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION SHALL EXTEND TO THE DRIP LINE, WITHIN WHICH NO CONSTRUCTION ACTIVITY, <br />MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED. TREE PROTECTION FENCING SHALL BE ERECTED PRIOR TO <br />CONSTRUCTION START PER PLANS OR AS DIRECTED BY OWNER/LANDSCAPE ARCHITECT AND SHALL CONSIST OF 4' TALL HEAVY DUTY <br />ORANGE CONSTRUCTION FENCING WITH 6' STEEL FENCE POSTS SPACED 6' O.C. MAX. <br />2. EROSION CONTROL. REFER TO CIVIL PLAN SHEETS FOR STORMWATER POLLUTION PREVENTION PLAN (SWPPP), AND TEMPORARY AND <br />PERMANENT STORMWATER BMPS, INCLUDING SILT FENCE, BIO—ROLLS, INLET PROTECTION, EROSION CONTROL BLANKETING, DUST <br />CONTROL, SWEEPING AND ROCK CONSTRUCTION ENTRANCE. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT STABILIZATION IN <br />ACCORDANCE WITH THE LANDSCAPE PLAN WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED AREA HAS CEASED. IN <br />THE EVENT PERMANENT STABILIZATION CANNOT BE IMPLEMENTED WITHIN 7 DAYS, TEMPORARY STABILIZATION BMPS MUST BE <br />IMPLEMENTED WITHIN 7 DAYS USING RAPID STABILIZATION METHOD 3. <br />3. CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL AREAS INDICATED AS BEING <br />DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL TREES, <br />STUMPS, BRUSH, GRASS, ROOTS AND OTHER ORGANIC MATERIAL AT AN APPROVED OFF —SITE DISPOSAL LOCATION. <br />4. SOIL PREPARATION. REFER TO GEOTECHNICAL REPORT FOR ANY REQUIRED SOIL CORRECTIONS, AMENDMENTS OR ADDITIONAL <br />INFORMATION (IF APPLICABLE). EXISTING TOPSOIL SHALL BE STRIPPED FROM ALL DISTURBED AREAS AND STOCKPILED IN AN <br />APPROVED LOCATION FOR RE —SPREAD. ALL AREAS WHERE SOIL HAS BEEN COMPACTED BY CONSTRUCTION ACTIVITY AND THAT ARE <br />INDICATED TO BE SODDED, SEEDED OR PLANTING BED SHALL BE DE —COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BY SOIL <br />RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD PRIOR TO INSTALLATION OF ANY IRRIGATION, SEEDING, PLANTING, <br />SODDING, ETC. <br />5. TOPSOIL MATERIAL. ALL EXISTING, AMENDED OR IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS OF MNDOT TOPSOIL TYPE A. A <br />MINIMUM 4 INCH DEPTH OF TOPSOIL SHALL BE RE —SPREAD OR PLACED ON ALL AREAS TO BE SODDED OR SEEDED, INCLUDING <br />DISTURBED OPEN SPACE AND NATURAL AREAS. ALL TOPSOIL SHALL BE FINE GRADED, RAKED AND DRAGGED TO PROVIDE A SMOOTH, <br />UNIFORM SURFACE. TOPSOIL GRADES SHALL BE WITHIN .1 FEET OF INDICATED FINISHED GRADE AND SHALL BE TRUE TO GRADIENTS <br />SHOWN ON PLANS. REFER TO CIVIL PLAN SHEETS FOR FILTRATION BASIN SOIL REQUIREMENTS (IF APPLICABLE). <br />6. SEEDING AND TURF ESTABLISHMENT. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND <br />TOPSOIL PREP PRIOR TO SEEDING. APPLY 10-10-10 TYPE I STARTER FERTILIZER AT A RATE OF 200 LBS PER ACRE PRIOR TO <br />SEEDING. SEEDS SHALL BE SOWED AT THE INDICATED RATE, VIA BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING <br />SEED APPLICATION, INSTALL CATEGORY 20 — STRAW EROSION CONTROL BLANKET WITH NATURAL NETTING ON ALL SLOPES GREATER <br />THAN 4:1. IN ALL OTHER AREAS, APPLY DISC —ANCHORED TYPE 3 MULCH (MCIA CERTIFIED WEED FREE GRAIN STRAW) AT A RATE OF <br />2 TONS PER ACRE. SOIL SHALL BE KEPT MOIST DURING ESTABLISHMENT WITH ADDITIONAL RE —SEEDING AS NECESSARY TO ACHIEVE A <br />HEALTHY, UNIFORM STAND OF GRASS, FREE OF WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'x10' AREA PRIOR TO FINAL <br />ACCEPTANCE. <br />7. SODDING. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR TO <br />SODDING. APPLY 10-10-10 TYPE I STARTER FERTILIZER AT A RATE OF 200 LBS PER ACRE PRIOR TO SODDING AND ROLL TOPSOIL TO <br />CREATE A UNIFORM SURFACE FOR LAYING SOD. SOD SHALL NOT BE CUT MORE THAN 24—HOURS IN ADVANCE OF INSTALLATION. <br />CONTRACTOR SHALL KEEP SOD MOIST FOR A MINIMUM OF 30 DAYS AND SHALL BE RESPONSIBLE FOR MAINTAINING THE SOD UNTIL <br />FINAL ACCEPTANCE. <br />8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI—Z60, LATEST <br />EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT <br />MATERIALS. OWNER/LANDSCAPE ARCHITECT RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY <br />BEFORE, DURING, OR AFTER INSTALLATION. NO SUBSTITUTION OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING <br />BY THE OWNER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />9. PLANT MATERIAL SUBSTITUTIONS. ALL REQUESTS FOR PLANT SUBSTITUTIONS SHALL BE MADE IN WRITING TO THE OWNER/LANDSCAPE <br />ARCHITECT AND MUST BE APPROVED BY THE CITY. <br />10. PLANT INSTALLATION AND ESTABLISHMENT. REFER TO STANDARD PLANTING DETAILS. CONTRACTOR SHALL STAKE TREE LOCATIONS FOR <br />APPROVAL BY OWNER/LANDSCAPE ARCHITECT PRIOR TO PLANTING. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES <br />(PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE <br />SAME SPECIES, QUANTITY, AND SIZE. <br />11. MULCH MATERIAL. DOUBLE SHREDDED HARDWOOD MULCH OR ROCK MULCH AS INDICATED ON PLANS. ALL MULCH SHALL BE CLEAN <br />AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER DELETERIOUS MATERIAL, AND SHALL BE INSTALLED OVER A NON —WOVEN GEOTEXTILE <br />FABRIC (INCIDENTAL) OR OTHER APPROVED WEED BARRIER TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE HELD BACK FROM <br />PLANT STEMS/TRUNKS A MINIMUM OF Y. WOOD MULCH SHALL BE PLACED AROUND INDIVIDUAL TREES TO A 4' MINIMUM DIAMETER. <br />MULCH SHALL BE INSTALLED WITHIN 48—HOURS OF PLANT INSTALLATION. <br />12. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALL <br />BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND <br />PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE MOWING, TRIMMING, WATERING, FERTILIZING, <br />WEED AND PESTICIDE CONTROL, MULCHING, REMOVAL OF DEAD MATERIALS, RE —SETTING PLANTS TO PROPER GRADE AND KEEPING <br />PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES, HOWEVER, THE <br />CONTRACTOR SHALL RETAIN RESPONSIBILITY FOR ALL PLANT MATERIAL THROUGH THE COMPLETION OF THE WARRANTY PERIOD. <br />13. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL MAINTAIN A WATERING SCHEDULE <br />WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A MINIMUM OF ONCE A WEEK. MORE FREQUENT WATERING MAY BE <br />REQUIRED DURING PERIODS OF HOT, DRY WEATHER. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. IN THE <br />ABSENCE OF PERMANENT IRRIGATION, TEMPORARY IRRIGATION, TREE WATERING BAGS, OR HAND —WATERING ARE ACCEPTABLE. <br />14. NATIVE PLANT ESTABLISHMENT. THIS PROJECT INCLUDES ONE OR MORE NATIVE PLANT SEED MIXES CONSISTING OF A VARIETY OF <br />GRASSES, SEDGES AND FLOWERING FORBS. BECAUSE THESE PLANTS TYPICALLY HAVE A LONGER GERMINATION PERIOD, A COVER CROP <br />SPECIES IS REQUIRED TO PROVIDE TEMPORARY COVER AND STABILIZATION. MAINTENANCE OF THESE SEEDED AREAS IS CRITICAL <br />DURING THE FIRST SEVERAL YEARS TO ESTABLISH A SUCCESSFUL NATIVE PLANT COMMUNITY. SEEDED AREAS SHALL BE MOWED / <br />WEED —WHIPPED TO A HEIGHT OF 6-10 INCHES IN MID—JULY AND EARLY SEPTEMBER DURING THE FIRST 2-3 YEARS OF <br />ESTABLISHMENT. IN ADDITION, ALL NON—NATIVE SPECIES / WEEDS SHALL BE SPOT SPRAYED NO LESS THAN 3 TIMES A YEAR WITH <br />HERBICIDE BY A LICENSED APPLICATOR. RE —SEEDING AS NECESSARY SHALL OCCUR IN MAY. A NATIVE PLANT COMMUNITY SHALL BE <br />CONSIDERED SUCCESSFULLY ESTABLISHED NO SOONER THAT 3 YEARS AFTER INITIAL SEEDING — ONCE THE COVER CROP HAS BEEN <br />SUFFICIENTLY REPLACED BY NATIVE PLANTS AND THE AREA IS FREE OF ALL NON—NATIVE AND INVASIVE SPECIES. AT THIS TIME, <br />MAINTENANCE CAN BE REDUCED TO MOWING / WEED —WHIPPING TO A HEIGHT OF 6-10 INCHES ONCE A YEAR IN EARLY SEPTEMBER <br />AND SPOT SPRAYING OF HERBACIDE ONLY AS NEEDED. <br />15. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST FINAL ACCEPTANCE OF THE WORK <br />IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK IS FOUND TO BE INCOMPLETE OR UNSATISFACTORY IN THE OPINION <br />OF THE OWNER/LANDSCAPE ARCHITECT, A WRITTEN PUNCH LIST WILL BE PREPARED LISTING ALL ITEMS THAT REQUIRE COMPLETING OR <br />CORRECTING BEFORE FINAL ACCEPTANCE. <br />16. WARRANTY. ALL PLANTS, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM THE DATE OF FINAL <br />ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND <br />MATERIAL. <br />Print Name: Ryan J. Ruttger, RLA Drawn: RJR <br />Signature:. Designed: RJR <br />Date: 3/4/25 License #: 56346 1 Date: 3/4/25 <br />Revisions: <br />1. 04/25/25 - Per City Comments <br />PLANT SCHEDULE <br />SYMBOL <br />CODE <br />QTY <br />BOTANICAL NAME <br />�COMMONNAME <br />SIZE <br />CONTAINER <br />TREES <br />• <br />RM <br />16 <br />Acer rubrum 'Northwood' <br />Northwood Red Maple <br />2" Cal. <br />B&B <br />• <br />FM <br />18 <br />Acer x freemanii 'Sienna' <br />Sienna Glen Maple <br />2" Cal. <br />B&B <br />' <br />RB <br />12 <br />Betula nigra <br />Clump Form, 2" Cal Equivalent <br />River Birch Multi -Trunk <br />8' Ht. <br />B&B <br />• <br />HB <br />8 <br />Celtis occidentalis <br />Common Hackberry <br />2" Cal. <br />B&B <br />• <br />HL <br />14 <br />Gleditsia triacanthos inermis ' Harve' <br />Northern Acclaim Thornless Honey Locust <br />2" Cal. <br />B&B <br />• <br />KC <br />14 <br />Gymnocladus dioica 'Espresso' <br />Kentucky Coffeetree <br />2" Cal. <br />B&B <br />• <br />WO <br />37 <br />Quercus bicolor <br />Swamp White Oak <br />2" Cal. <br />B&B <br />• <br />HO <br />8 <br />Quercus x macdanielii 'Clemons' TM <br />Heritage Oak <br />2" Cal. <br />B&B <br />• <br />BL <br />16 <br />Tilia americana 'Boulevard' <br />Boulevard Linden <br />2" Cal. <br />B&B <br />• <br />AE <br />14 <br />Ulmus americana 'Princeton' <br />American Elm <br />2" Cal. <br />B&B <br />CONIFEROUS TREES <br />BF <br />16 <br />Abies balsamea <br />Balsam Fir <br />6' Ht. <br />B&B <br />• <br />BH <br />15 <br />Picea glauca densata <br />Black Hills Spruce <br />6' Ht. <br />B&B <br />Q) <br />PP <br />11 <br />Pinus ponderosa <br />Ponderosa Pine <br />6' Ht. <br />B&B <br />NWiuriu tivw` <br />a <br />• <br />WP <br />17 <br />Pinus strobus <br />White Pine <br />6' Ht. <br />B&B <br />ORNAMENTAL TREES <br />OB <br />9 <br />Aesculus glabra 'JN Select' TM <br />Early Glow Ohio Buckeye <br />1.5" Cal. <br />B&B <br />SIB <br />18 <br />Amelanchier x grandiflora Autumn Brilliance' <br />Clump Form, 1.5" Cal Equivalent <br />Autumn Brilliance Serviceberry <br />7' Ht. <br />B&B <br />BB <br />15 <br />Carpinus caroliniana <br />Native <br />Blue Beech <br />1.5" Cal. <br />B&B <br />HT <br />13 <br />Crataegus crus-galli ' Inermis' <br />Thornless Hawthorn <br />1.5" Cal. <br />B&B <br />CA <br />17 <br />Malus x ' Prairifire' <br />Red Flowers <br />Prairifire Crabapple <br />1.5" Cal. <br />B&B <br />JL <br />21 <br />Syringa reticulata 'Ivory Silk' <br />White Flowers <br />Ivory Silk Japanese Tree Lilac <br />1.5" Cal. <br />B&B <br />GROUND COVERS <br />SOD <br />88,633 sf <br />Turf Sod Bluegrass <br />Kentucky Bluegrass <br />sod <br />Type I - Turf Seed Mix <br />Ti <br />79,793 sf <br />Refer to notes for acceptable seeding methods <br />MnDOT Southern Boulevard (SB) <br />seed <br />Seeding Rate 160 Ib/ac <br />Type II - Native Seed Mix (Buffer) <br />TII <br />105,301 sf <br />Refer to notes for acceptable seeding methods <br />MnDOT Southern Tallgrass Roadside (STR) <br />seed <br />Seeding Rate 39 Ib/ac <br />Type III - Stormwater Seed Mix <br />TIII <br />103,774 sf <br />Refer to notes for acceptable seeding methods <br />MnDOT Wet Ditch (WD) <br />seed <br />Seeding Rate 30 Ib/ac <br />M/I HOMES OF MINNEAPOLIS, LLC <br />5354 Parkdale Drive, #100 <br />St. Louis Park, Minnesota 55416 <br />NATURES REFUGE NORTH <br />Lino Lakes, Minnesota <br />PRELIMINARY <br />LANDSCAPE PLAN <br />L4 <br />of <br />4 <br />#5412-03 <br />f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\landscape\5412-03_landscape.dwg <br />