My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-12-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-12-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 1:35:10 PM
Creation date
5/19/2025 12:46:24 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/12/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 6C <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: May 12, 2025 <br />TOPIC: Consider Resolution Number No. 25-57, Authorize the Preparation <br />of Plans and Specs, Andall Street Culvert Project <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting Council authorization to prepare plans and specifications for the Andall <br />Street Culvert Project. <br />BACKGROUND <br />The City's annual Surface Water Management Program (SWMP) addresses areas in need of <br />maintenance, and conforms to the City's Storm Water Pollution and Prevention Plan. For the <br />2025 SWMP the City will include the Andall Street Culvert Project, which includes replacing a <br />36" culvert and two catch basin structures along Rice Creek Watershed District (RCWD) Ditch <br />10-22-32 and cleaning out a skimmer structure on Blackbird Lane. <br />In 2024 the City public works department addressed an erosion issue at the catch basins. In <br />addition they inspected the culvert with RCWD staff. It was determined that the culvert was <br />deteriorating and in need of replacement. Staff has had conversations with RCWD and they <br />fully support the maintenance/ replacement project. The project will be reviewed and <br />permitted by RCWD. <br />WSB LLC has submitted a proposal to complete the topographic survey, plans and <br />specifications, and provide bid documents for the Andall Street Culvert Project for a total not to <br />exceed the amount of $18,400.00. <br />The estimated total project cost is $130,000.00. Funding for the project is expected to be from <br />the Surface Water Utility Fund. <br />The project is proposed to be completed by September 30, 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.