Laserfiche WebLink
2 <br />0 <br />0 <br />(7 <br />Z <br />w <br />m <br />0 <br />C. <br />00 <br />U) <br />Lo <br />Z <br />U) <br />J <br />0 <br />a <br />a <br />w <br />Z <br />Z <br />C. <br />0 <br />Cl) <br />w <br />I <br />w <br />Z) <br />Z <br />w <br />a <br />a <br />Z <br />w <br />x <br />0 <br />wsb <br />May 7, 2025 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal to Complete Andall Street Culvert Project Construction Plans and <br />Specifications <br />Dear Mr. Grochala: <br />WSB LLC. is providing this proposal for the design and bidding services for the Andall <br />Street Culvert Project. This project includes replacing a 36" culvert and two structures <br />along Rice Creek Watershed District (RCWD) Ditch 10-22-32 and cleaning out a <br />skimmer structure on Blackbird Lane. <br />Based on the project scope, WSB would perform the following tasks: <br />Prepare Project Plans <br />Construction plans will be prepared indicating the project locations and <br />plan view sheets for the culverts. Surveyed topographic information will <br />be used to prepare the construction plans. Base drawing information will <br />include GSOC design locates, curb inspection, city parcel map <br />information and record plans. <br />II. Final Quantities <br />An Engineer's Opinion of Probable Cost will be completed with the final <br />construction plans. <br />III. Prepare Permits, Specifications and Quoting Documents <br />WSB will assist the City in preparing permit application(s) and/or approval <br />requests and will assist the City with submitting the applications/approval <br />requests to the appropriate regulatory agencies. <br />Working with RCWD and obtaining a permit for work associated with ACD <br />10-22-32. <br />WSB will develop the project plans and specifications based on the <br />agency review comments. This task will include an internal <br />constructability review of the plans, quantities, and specifications. <br />Upon completion of permitting, and agency review and approval, a final <br />set of construction documents will be prepared for quoting. <br />WSB will assemble and submit the final contract documents, and solicit <br />quotes for the project from at least five contractors. WSB will receive and <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 SWMP\Staff <br />Reports\20250512 CC Authorize Plans and Spec - Andall St Culvert\3. WSB Design Proposal.docx <br />