Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 5 <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />15. Confirm drainage area delineations match site grading, some areas on the perimeter <br />of the sites do not appear possible to route to proposed stormwater basins as <br />indicated in HydroCAD. <br />(DTE 3/11/2025) The drainage areas have been updated per the comment. <br />(WSB 4/2/2025) The existing modeled drainage area of 4.551 acres exceeds the <br />proposed modeled drainage area of 4.071 acres. These areas must match for proper <br />confirmation of rate control. <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />17. (WSB 4/2/2025) It is recommended to consolidate the parking space curb cuts going <br />into IB-1. <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />18. (WSB 4/2/2025) The IB-1 storage curve in the HydroCAD modeling is incorrect for <br />the 906 contour. <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />Java Properties - Lino Retail 2.0 Engineering Review <br />