My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-02-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-02-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:29:18 PM
Creation date
5/28/2025 4:07:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/02/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />05/07/2025 <br />Page 7 <br />(DTE 3/11/2025) The utility plan has been revised per the comment <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1s' Addition <br />rani sire mentc <br />(DTE 3/11/2025) Notes have bee; addedte the Removal Plans statiRg the <br />i nferm;;#inn from then ono <br />(VVSB 4/2/2025) Gemnlete <br />7. (WSB 4/2/2025) Provide 6" gate valve when connecting to the western water service <br />south of Marketplace Drive <br />a. Provide temporary hydrant or air release bleed pipe on southern end <br />8. (WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1s' Addition <br />• Sanitary Sewer <br />Existing and proposed sanitary sewer services are provided for the 3 commercial lots <br />through existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future <br />Market Place Drive. <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as -bid plans <br />(WSB 5/7/2025) City to provide two sets of utility stubs (6" PVC C900 water and 4" <br />PVC sanitary sewer with gate valves roughly at the easement line) <br />2. Building A will utilize the existing 6" sanitary sewer service stub instead of installing a <br />new service wye <br />a. Cut back on the existing riser as necessary to lower the sanitary sewer <br />service and maintain minimum cover below the existing basin <br />(DTE 3/11/2025) The utility plan has been revised per the comment. <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />• Transportation <br />In the 2025 construction season the City will realign 771h St to the Market Place Dr / <br />CSAH 23 (Lake Dr) signalized intersection. When the Market Place Dr signal was <br />installed the median at 77th St was also installed. The intent was that 77th would realign <br />Java Properties - Lino Retail 2.0 Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.