My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-02-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-02-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:29:18 PM
Creation date
5/28/2025 4:07:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/02/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />WORK SESSION STAFF REPORT <br />ITEM NO. 7 <br />STAFF ORIGINATOR: Michael Grochala, Community Development Director <br />WORK SESSION DATE: June 2, 2025 <br />TOPIC: Water & Sewer JPA with White Bear Township/City of North Oaks <br />BACKGROUND <br />As previously discussed, the Wilkinson Waters development, located in the northwest quadrant <br />of Centerville Road and County Road J is proposed to be served by White Bear Township <br />utilities. Staff has been working with both the Township and the City of North Oaks on a joint <br />powers agreement (JPA) to secure access to these utilities. <br />The project is in Lino Lakes Sanitary Sewer District 4, which is planned to serve the Southeast <br />Quadrant of the City, generally east of Holly Drive and South of Holly Drive East & Birch Street. <br />The area will be served by an 18" trunk sanitary line that runs along Centerville Road in White <br />Bear Township. The City's Comprehensive Plan identifies the need to enter into a JPA with <br />White Bear Township to acquire capacity from this line. <br />Water is proposed to be temporarily provided by White Bear Township through water mains <br />installed in the City of North Oaks. The Wilkinson Waters project has water main stubbed to <br />the property along with lateral water mains running through the property serving the Rapp <br />Farm development on the west side of Wilkenson Lake. White Bear Township currently has <br />agreements in place with North Oaks Development Company for water supply. Staff is <br />anticipating a minimum service timeline of 10 years. Ultimately the property is planned to be <br />serviced by Lino Lakes utilities once extended. <br />A draft agreement has been prepared based on existing agreements between North Oaks and <br />White Bear Township. Staff is working through the agreement components to address sanitary <br />sewer flow, billing responsibilities, rates and metering locations. Wate rates for the project <br />may be different than rates charged for the balance of the City. White Bear Township charges <br />North Oaks a base rate equal to 125% of their tier 1 residential water rates. This would result <br />in a base water rate of $3.25 per thousand gallons. For comparison Lino Lakes current tier 1 <br />rate is $2.19 per thousand. We are anticipating a similar fee as part of our JPA. <br />REQUESTED COUNCIL DIRECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.