My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/11/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
06/11/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 10:11:03 AM
Creation date
6/5/2025 10:10:56 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/11/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erickson Propertyis consistent with infill policies. The development is within the current <br />Utility Staging Area 1B=2025-2030. The cost, operation and maintenance of the utility <br />system is consistent with the normal costs projected by the water and sanitary system <br />plans. No future utility costs are proposed. <br /> <br />(c) Roads or highways to serve the subdivision. A proposed subdivision shall meet <br />the following requirements for level of service (LOS), as defined by the Highway <br />Capacity Manual: <br />1. If the existing level of service (LOS) outside of the proposed subdivision is A or <br />B, traffic generated by a proposed subdivision will not degrade the level of service <br />more than one grade; <br />2. If the existing LOS outside of the proposed subdivision is C, traffic generated by <br />a proposed subdivision will not degrade the level of service below C; <br />3. If the existing LOS outside of the proposed subdivision is D, traffic generated by <br />a proposed subdivision will not degrade the level of service below D; <br />4. The existing LOS must be D or better for all streets and intersections providing <br />access to the subdivision. If the existing level of service is E or F, the subdivision <br />developer must provide, as part of the proposed project, improvements needed to <br />ensure a level of service D or better; <br />5. Existing roads and intersections providing access to the subdivision must have <br />the structural capacity to accommodate projected traffic from the proposed <br />subdivision or the developer will pay to correct any structural deficiencies; <br />6. The traffic generated from a proposed subdivision shall not require city street <br />improvements that are inconsistent with the Lino Lakes capital improvement plan. <br />However, the city may, at its discretion, consider developer-financed <br />improvements to correct any street deficiencies; <br />7. The LOS requirements in divisions (2)(c)1. to 4. above do not apply to the I- <br />35W/Lake Drive or I-35E/Main St. interchanges. At city discretion, interchange <br />impacts must be evaluated in conjunction with Anoka County and the Minnesota <br />Department of Transportation, and a plan must be prepared to determine <br />improvements needed to resolve deficiencies. This plan must determine traffic <br />generated by the subdivision project, how this traffic contributes to the total <br />traffic, and the time frame of the improvements. The plan also must examine <br />financing options, including project contribution and cost sharing among other <br />jurisdictions and other properties that contribute to traffic at the interchange; and <br /> 8. The city does not relinquish any rights of local determination. <br /> <br />Erickson Property meets the requirements for level of service (LOS). Osakis Street and <br />th <br />20 Avenue havecapacity to accommodate 14 new single family homes. The city does <br />not relinquish any rights of local determination. <br /> <br />(d) Water supply. A proposed subdivision shall be deemed to have an adequate <br />water supply when: <br />13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.