Laserfiche WebLink
5.Fill stockpiles shall be at least 50-ft from the road easement and property lines. <br />6.The total fill stockpiles shall not exceed 210,000 square feet in area. <br />7.The northwestern stockpile shall have a maximum top elevation of 925, the <br />northeastern stockpile shall have a maximum top elevation of 924, and the <br />southern fill stockpile shall have a maximum top elevation of 922. <br />8.Maximum side slope of fill stockpiles to be 4:1/ <br />9.Equipment on site shall be limited to what is necessary for earth moving and <br />filling operations, including loading and hauling equipment, and equipment <br />needed for grading. Non-functioning equipment is not allowed to be stored on <br />site. <br />10. Vehicles entering and leaving the site shall adhere to the road weight restrictions <br />for each roadway. <br />11. No fill may be placed in the delineated wetlands, the Natural Resource <br />Conservation Area, or the FEMA floodplain on the site. <br />12. Owner will follow the applicable standards and requirements of the City of Lino <br />Lakes, Rice Creek Watershed District, Army Corp of Engineers, Minnesota <br />Pollution Control Agency, Minnesota Department of Natural Resources and any <br />other agency having jurisdiction over the property and shall secure and file with <br />the City, copies of any permits required by outside agencies. Owner will file with <br />the City within ten (10) days of receipt, copies of any permits and/or notice of <br />enforcement actions by these agencies. <br />13. Owner will permit a City Inspector to view the premises during normal business <br />hours. <br />14. The Interim Use Permit shall only be valid for 5 years once approved by City <br />Council. All grading, stockpiling, and final turf establishment must be completed <br />within the 5 years. The permit may be extended by the City Council following a <br />written request bythe applicant submitted at least three months prior to <br />expiration, and review at a public hearing. <br />15. A Site Performance Agreement shall be executed and recorded. <br />ATTACHMENTS <br />1.Site Location & Aerial Map <br />2.City Engineer Letter dated January 4, 2023 <br />3. City Environmental Coordinator Letter dated January 4, 2023 <br />4.IUP Application Grading Plan dated December 15, 2022 <br />11 <br /> <br />